Overview of Existing SmTSTW and Sewage Catchment Area

Overview of Existing SmTSTW and Sewage Catchment Area

About the Existing SmTSTW

The SmTSTW, located at Sham Tsz Street, Sham Tseng, has been in operation since 2004. It provides sewage treatment services to a population of about 39,000 in the areas from Approach Bay to Tsing Lung Tau along Castle Peak Road.

Site Footprint

1.1 Hectare

Design Sewage Treatment Capacity

17,000m3 per day

Sewage Treatment Facility

Chemically Enhanced Primary Treatment