Executive Summary......................................................................................................................... 1
8 SUMMARY
OF NOTIFICATION OF SUMMONS, SUCCESSFUL PROSECUTIONS AND CORRECTIVE ACTIONS 30
Appendices
Appendix A Site Map and
Works Area
Appendix C Construction
Programme
Appendix D Implementation
Status of Environmental Mitigation Measures
Appendix E Status of
License and Permit
Appendix F Calibration
Certificates
Appendix G Monitoring
Locations
Appendix J Interim
Notifications of Environmental Quality Limits Exceedances
List of
Tables
Table 3‑1 Air Quality
Monitoring Equipment
Table 3‑2 Air Quality
Monitoring Locations
Table 3‑3 Action &
Limit Levels for Air Quality
Table 3‑4 Event/Action Plan
for Air Quality
Table 3‑5 Noise
Monitoring Equipment
Table 3‑6 Noise Monitoring
Locations
Table 3‑7 Action & Limit
Levels for Noise
Table 3‑8 Event/Action Plan
for Noise
Table 3‑9 Water Quality
Monitoring Equipment
Table 3‑10 Water Quality Monitoring
Locations
Table 3‑11 Action/Limit Levels for Water
Quality
Table 3‑12 Event/Action Plan for Water
Quality
Table 4‑1 Air Quality
Monitoring Results
Table 4‑2 Noise
Monitoring Results
Table 4‑3 Summary of
Exceedances for I-1
Table 4‑4 Summary of
Exceedances for I-2
Table 4‑5 Summary of
Exceedances for I-3
Table 4‑6 Water Quality
Monitoring Results
Table 4‑7 Summary of
Project-Related Exceedances
Table 5‑1 Waste
Generated in December 2008
Table 6‑1 Site
Inspection by ET
Table 7‑1 Cumulative
Statistic of Environmental Complaint
Table 8‑1 Cumulative
Statistics of Notification of Summons and Successful Prosecutions
2.
According
to the EM&A Manual, there are four designated air quality monitoring
locations, five designated noise monitoring locations and four water quality
monitoring locations during the construction phase: (i) Sik Sik Yuen Ho Fung
College (ASR 1, NSR 1 and Intake I-1); (ii) Hong Hoi Chee Hong Temple (ASR 3,
NSR 3 and Intake I-2); (iii) Squatters (NSR 6 and Intake I-3); (iv) Beach Tower
(Long Beach Gardens) (ASR 8, NSR 8 and Outfall O-1); and (v) Greenview Terrace
(Block 1) (ASR 9, NSR 9 and Outfall O-1).
3.
During
the non restricted hours, major construction activities undertaken by the
Contractor at TWDT included Site clearance at I-1, I-2,
I-3 and Outfall; hoarding & fencing erection at I-3 and Outfall; tree
transplanting at I-1, I-3 and Outfall; slope stabilization at Outfall; soil
nailing at I-3 and Outfall; pipe pile at I-1; relocation of verified boulder at
Outfall; formation of access road at Outfall and pre-bore H-piling at I-3.
4.
No
exceedance has been recorded for
air quality and noise monitoring during the reporting month. Detail interpretation of
the result could be referred to Section 4.1 and 4.2 of this report.
5.
Exceedances
for water quality monitoring are summarized in the following table:
|
Parameter |
Action Level Exceedance |
Limit Level Exceedance |
|
DO |
Nil |
Nil |
|
Turbidity |
Nil |
Nil |
|
SS |
§
Two recorded at
I-1 on 5 and 8 December §
One recorded at
I-3 on 29 December |
§
One recorded at
I-1 on 19 December |
6.
These exceedances were considered not to be project-related as no direct disturbance was observed
contributed by the project construction activities. Detail interpretation could
be referred to Section 4.3 of this report.
7.
The
status of waste generation in the reporting month are:
§
A
total of 144.1 m3 C&D material was disposed of to public fill at
Tuen Mun and 10 m3 inert C&D materials were reused in KDB 400, a
line extension project of MTR Corportaion at Tai Kok Tsui;
§
About
6.2m3 general waste was disposed of to NENT Landfill;
§
Approximately
150 kg of paper/cardboard packaging was recycled;
§
No
plastic waste was disposed of in the reporting month;
§
No
chemical waste was disposed of in the reporting month; and
§
Approximately
5 kg of metal was generated in the reporting month.
8.
In this
reporting month, two site inspections and one monthly site audit were carried
out by ET and Independent Environmental Checker (IEC) respectively, to ensure
proper implementation of environmental mitigation measures specified in the
EM&A Manual and compliance with environmental legislation. All observations, which were recorded
on the inspection checklists, were passed to the Contractor together with the
ET’s recommendations.
9.
As
advised by the Contractor and verified by ET:
§
No
non-compliance was received in the reporting month;
§
No
environmental complaint was received during the reporting month; and
§
No
summons and prosecution was received in this reporting month.
10.
The
major construction works for the upcoming three months will be:
§
Site
clearance at I-1, I-2, I-3 and Outfall;
§
Hoarding
& fencing erection at I-3 and Outfall;
§
Tree
transplanting at I-1, I-3 and Outfall;
§
Slope
stabilization at Outfall;
§
Soil
nailing at I-3 and Outfall;
§
Pipe
pile at I-1;
§
Relocation
of verified boulder at Outfall;
§
Formation
of access road at Outfall;
§
Pre-bore
H-piling at I-3;
§
RCD at
I-2.
1.1.1
The
Drainage Services Department (DSD) proposes to construct a tunnel with an
internal diameter of 6.5m and a length of 5.13km, with the purpose to alleviate
the flooding risk in Tsuen Wan and Kwai Chung.
1.1.2
This
project is a Designated Project under Schedule 2 Part I Category Q, of the Environmental Impact
Assessment Ordinance (EIAO) as part of the proposed Tsuen Wan Drainage Tunnel
(TWDT) passes underneath the existing Tai Mo Shan Country Park.
An Environmental Impact Assessment (EIA) Study
has therefore been undertaken to provide information on the nature and extent
of environmental impacts arising from the construction and operation of the
proposed designed project and related activities taking place
concurrently. From the EIA the
recommendations for monitoring contained herein, are made.
1.1.3
The Maeda
- CREC - SELI Joint Venture (MCSJV) was awarded by DSD with the Contract – Design and Construction of Tsuen
Wan Drainage Tunnel.
1.1.4
Hyder
was commissioned by the MCSJV as the Environmental Team (ET) to implement an
EM&A program in accordance with the EM&A Manual. The proposed tunnel section flows from
the junction of Shing Mun Road and Wo Yi Hop Road and discharges to south of
Yau Kom Tau underneath Castle Peak Road as shown in Appendix A.
1.1.5
The
construction works of the Project was commenced in January 2008. This is the ninth monthly
EM&A report summarising the impact monitoring results and audit findings of
the EM&A program in December 2008.
2.1.1
The
organization chart and lines of communication with respect to the on-site
environmental management are shown in Appendix B.
2.2.1
The
overall project programme from the detail design to completion of all civil
works shall take approximately 54 months. The construction
programme is presented in Appendix C.
2.2.2
The major construction activities undertaken in the reporting month were:
§
Site
clearance at I-1, I-2, I-3 and Outfall;
§
Hoarding
& fencing erection I-3 and Outfall;
§
Tree
transplanting at I-1, I-3 and Outfall;
§
Slope
stabilization at Outfall;
§
Soil
nailing I-3 and Outfall;
§
Pipe
pile at I-1;
§
Relocation
of verified boulder at Outfall;
§
Formation
of access road at Outfall; and
§
Pre-bore
H-piling at I-3
2.2.3
No
construction activities were undertaken for TWDT during the restricted hours.
2.3.1
The
implemented environmental mitigation measures and their statuses are given in
Appendix D.
2.4.1
A
summary of relevant permits and licences for the Project is given in Appendix
E.
3.1.1
1-hour
Total Suspended Particulates (TSP) levels are measured at the designated air
monitoring locations in accordance with the EM&A Manual. Information such as date of monitoring,
duration, weather condition, equipment used and monitoring results were
recorded on the field data sheet developed for the Project. The monitoring results are presented in
Section 4.
3.1.2
1-hour
TSP monitoring is carried out under typical weather conditions (with no adverse
weather such as typhoon signal or rain storm warning) three times every six
days using High Volume Air Samplers (HVASs). Monitoring should be conducted in accordance with the
standard sampling method as set out in High Volume Method for Total Suspended
Particulates, Part 50 Chapter 1 Appendix B, Title 40 of the Code of Federal
Regulations of the USEPA.
3.1.3
After
each sampling, the filter paper loaded with dust is kept in a clean and tightly
sealed plastic bag. The filter paper is then re-conditioned in desiccators for
24 hours before obtaining the weight under laboratory conditions.
3.1.4
The
average concentrations of the TSP are calculated based on the following
information obtained from monitoring:
·
Flow rate;
·
Weight of the filter paper before and after sampling;
and
·
Sampling period indicated by the elapsed-time meter.
3.1.5
All
samples should be kept in good condition (i.e. stored in sealed plastic bags,
with brief description of the monitoring dates and locations) for a period of 6
months before disposal.
Sample analysis is
carried out by ALS
Technichem (HK) Pty Limited (HOKLAS Registration Number 066).
3.1.6
High
Volume Air Samplers (HVASs) are used for 1-hour TSP monitoring to comply with
the USEPA specifications in Appendix B Part 5 - Reference Method for the
Determination of Suspended Particulate matter in the Atmosphere (High-Volume Method)
of the Code of Federal Regulation dated June 1, 1991.
3.1.7
All
HVASs are calibrated before commencement of monitoring using standard orifice
5-points calibration method with orifice calibrator to determine the actual
flow rate of each HVAS. This shall
be used for the calculation of the TSP level. Calibration Kit Model - TE5025A is used for calibration of the
HVAS. Recalibration of the HVAS
shall be carried out after motor maintenance, at least once every six months,
which is about the expected life of carbon brush. The air quality monitoring
equipment used during the reporting month is shown in Table 3‑1 below.
The calibration certificates are included in Appendix F.
|
Equipment Type |
Model |
Serial Number |
Calibration Orifice Number |
Location |
|
HVAS |
BM2000HX |
4994 |
517N |
ASR 1 |
|
HVAS |
BM2000HX |
5875 |
517N |
ASR 3 |
|
HVAS |
TE5005X |
0390 |
517N |
ASR 8 |
|
HVAS |
TE5005X |
0646 |
517N |
ASR 9 |
Table 3‑1 Air
Quality Monitoring Equipment
3.1.8
Four
designated air quality-monitoring locations were identified in the contract
specific EM&A manual. They are
listed in Table
3‑2 below and shown in Appendix G.
|
Monitoring Station ID |
||
|
ASR1 |
Sik Sik Yuen Ho Fung
College |
G/F |
|
ASR3 |
Hong Hoi Chee Hong
Temple |
Podium |
|
ASR8 |
Beach Tower (Long Beach
Gardens) |
G/F |
|
ASR9 |
Greenview Terrace
(Block 1) |
G/F |
Table 3‑2 Air
Quality Monitoring Locations
3.1.9
The
Action and Limit Levels for the 1-hour TSP monitoring is shown in Table 3‑3. In case
exceedances of Action and/or Limit levels for air quality occur, Event
Contingency Plans (ECPs) would be implemented. The ECPs for Action and Limit levels exceedances are shown
in Table
3‑4.
|
Station |
1-hr TSP Level in μg/m3 |
|
|
Action Level |
Limit Level |
|
|
ASR 1 |
307 |
500 |
|
ASR 3 |
327 |
500 |
|
ASR 8 |
337 |
500 |
|
ASR 9 |
329 |
500 |
Table 3‑3 Action
& Limit Levels for Air Quality
|
EVENT |
ACTION |
|||
|
ET |
IEC |
SOR |
CONTRACTOR |
|
|
ACTION LEVEL |
||||
|
Exceedance for one sample |
· Identify source, investigate the causes of exceedance and propose remedial measures; · Inform IEC and SOR; · Repeat measurement to confirm finding; · Increase monitoring frequency to daily. |
· Check monitoring data submitted by ET; · Check Contractor’s working method. |
· Notify Contractor. |
· Rectify any unacceptable practice; · Amend working methods if appropriate. |
|
Exceedance for two or more consecutive samples |
· Identify source; · Inform IEC and SOR; · Advise SOR on the effectiveness of the proposed remedial measures; · Repeat measurements to confirm findings; · Increase
monitoring frequency to daily; · Discuss
with IEC and Contractor on remedial actions required; · If
exceedance continues, arrange meeting with IEC and SOR; · If exceedance stops, cease additional monitoring. |
· Check
monitoring data submitted by ET; · Check
Contractor’s working method; · Discuss
with ET and Contractor on possible remedial measures; · Advise
the ET on the effectiveness of the proposed remedial measures; · Supervise Implementation of remedial measures. |
· Confirm
receipt of notification of exceedance in writing; · Notify
Contractor; · Ensure remedial measures properly implemented. |
· Submit
proposals for remedial to SOR within 3 working days of notification; · Implement
the agreed proposals; · Amend proposal if appropriate. |
|
LIMIT LEVEL |
||||
|
Exceedance for one sample |
· Identify
source, investigate the causes of exceedance and propose remedial measures; ·
Inform IEC, SOR, Contractor and EPD; · Repeat
measurement to confirm finding; · Increase
monitoring frequency to daily; · Assess effectiveness of Contractor’s remedial actions and keep IEC, EPD and SOR informed of the results. |
· Check
monitoring data submitted by ET; · Check
Contractor’s working method; · Discuss
with ET and Contractor on possible remedial measures; · Advise
SOR on the effectiveness of the proposed remedial measures; · Supervise implementation of remedial measures. |
· Confirm
receipt of notification of exceedance in writing; · Notify
Contractor; · Ensure remedial measures properly implemented. |
· Take
immediate action to avoid further exceedance; · Submit
proposals for remedial actions to IEC within 3 working days of notification; · Implement
the agreed proposals; · Amend proposal if appropriate. |
|
Exceedance for two or more consecutive samples |
· Notify
IEC, SOR, Contractor and EPD; · Identify
source; · Repeat
measurement to confirm findings; · Increase
monitoring frequency to daily; · Carry
out analysis of Contractor’s working procedures to determine possible
mitigation to be implemented; · Arrange
meeting with IEC and SOR to discuss the remedial actions to be taken; · Assess
effectiveness of Contractor’s remedial actions and keep IEC, EPD and SOR
informed of the results; · If exceedance stops, cease additional monitoring. |
· Discuss
amongst SOR, ET, and Contractor on the potential remedial actions; · Review
Contractor’s remedial actions whenever necessary to assure their
effectiveness and advise SOR accordingly; · Supervise the implementation of remedial measures. |
· Confirm
receipt of notification of exceedance in writing; · Notify
Contractor; · In
consultation with the IEC, agree with the Contractor on the remedial measures
to be implemented; · Ensure
remedial measures properly implemented; · If exceedance continues, consider what portion of the work is responsible and instruct the Contractor to stop that portion of work until the exceedance is abated. |
· Take
immediate action to avoid further exceedance; · Submit
proposals for remedial actions to IEC within 3 working days of notification; · Implement
the agreed proposals; · Resubmit
proposals if problem still not under control; · Stop the relevant portion of works as determined by SOR until the exceedance is abated. |
Table 3‑4 Event/Action
Plan for Air Quality
3.2.1
The construction noise level is
measured in terms of equivalent A-weighted sound pressure level (Leq)
measured in decibels (dB(A)).
Monitoring of Leq(30 min) is carried out at the noise
monitoring locations on a weekly basis during normal construction working hours
(0700-1900 hours from Monday to Saturday except public holidays). For all other time periods (i.e.
restricted hours), Leq(5 min) would be employed for comparison with
the Noise Control Ordinance (NCO) criteria if necessary.
3.2.2
The two statistical sound
levels L10 and L90: the level exceeded for 10 and 90
percent of the time respectively, are also recorded during monitoring. Major noise sources observed, both
on-site and off-site, are recorded on the field data sheet. All measurements are recorded to the nearest
0.1 dB(A) and presented in round numbers in this report. Results are presented in Section 4.
3.2.3
Sound level meters, which
comply with the International Electrotechnical Commission Publication 651: 1979
(Type 1) and 804: 1985 (Type 1) specifications as referred to the Technical
Memorandum (TM) issued under the Noise Control Ordinance, are used. Noise levels for the A-weighted levels
Leq(30min), L10 and L90 are measured
throughout the impact monitoring.
Average, by sound power, of six consecutive 5 minutes readings is used
to provide Leq(30 min) for non-restricted hours (07:00-19:00 hours
from Monday to Saturday except public holidays). A facade correction of 3dB(A) is applied to the measurements
that are carried out under free field conditions.
3.2.4
During the impact monitoring,
parameters such as dates, weather condition, equipment used, measurement
results and major noise sources are recorded on the field data record
sheet. Monitoring would not be
carried out in the presence of fog, rain or strong wind with a steady speed exceeding
5 m/s. In relation to the
monitored noise levels, other noise sources such as road traffic might make a
significant contribution to the overall noise environment. Therefore, noise monitoring activities
would take into account such influencing factors, which were not present during
the baseline monitoring period.
3.2.5
Bruel & Kjaer (B&K)
Precision Integrating Sound Level Meters of Type 2238 in compliance with the
International Electrotechnical Commission Publication 651: 1979 (Type 1) and
804: 1985 (Type 1) Specifications, stated in the Technical Memorandum (TM)
issued under the NCO, are used for noise monitoring.
3.2.6
Prior to and following each
noise measurement, the accuracy of the sound level meter is checked using an
acoustic calibrator (B&K Type 4231, (S/N 1770806) generating a known sound
pressure level at a known frequency.
Measurements are considered as valid only if the calibration levels from
before and after the noise measurement agrees to within 1.0 dB(A). The sound level meters and the
calibrator are calibrated annually to ensure they perform to the same level of
accuracy as stated in the manufacturer’s specifications. The noise monitoring equipment used
during the reporting month is shown in Table 3‑5 below.
The calibration certificates are included in Appendix F.
|
Equipment
Type |
Manufacturer |
Type
Number |
Serial
Number |
Location |
|
Sound
Level Meter |
Bruel
& Kjaer |
2238 |
2285726 |
NSR1,
NSR3, NSR6, NSR8 and NSR9 |
|
Sound
Level Calibrator |
Bruel
& Kjaer |
4231 |
1770806 |
NSR1,
NSR3, NSR6, NSR8 and NSR9 |
Table 3‑5 Noise
Monitoring Equipment
3.2.7
Five designated noise
monitoring locations were identified in the contract specific EM&A
manual. They are listed in Table 3‑6 below and shown in Appendix G.
|
Monitoring Station ID |
Name of Premises |
Floor Level |
|
NSR1 |
Sik Sik Yuen Ho Fung College |
G/F |
|
NSR3 |
Hong Hoi Chee Hong Temple |
Podium |
|
NSR6 |
Squatters |
G/F |
|
NSR8 |
Beach Tower (Long Beach Gardens) |
G/F |
|
NSR9 |
Greenview Terrace (Block 1) |
G/F |
Table 3‑6 Noise
Monitoring Locations
3.2.8
Prediction of construction
groundborne noise indicates the criteria will be achieved at most NSRs except
exceedances are predicted at Hong Hoi Chee Hong Temple (NSR3) and Squatters
(NSR6). It is recommended to
restrict the TBM operation in non-restricted period (i.e. 0700 - 1900) at these
NSRs. In order to ensure proper
control of groundborne noise is executed by the contractor, a monitoring
requirement is recommended at the Hong Hoi Chee Hong Temple at Intake 2 and
Squatters at Intake 3 for compliance checking. According to the monitoring schedule, TBM operation will be
carried out for about 3 months in the vicinity of Hong Hoi Chee Hong Temple at
Intake 2 and Squatters at Intake 3.
If groundborne noise criterion is exceeded, the monitoring shall
continue daily until acceptance has been restored against the criterion. Otherwise the monitoring can be
discontinued.
3.2.9
The criteria including
Technical Memorandum for the Assessment of Noise from Places other than
Domestic Premises, Public Places or Construction Sites (TM-Places) under the
NCO stipulates that noise transmitted primarily through the structural elements
of building, or buildings, shall be 10 dB(A) less than the relevant ANLs. Daytime groundborne construction noise
criterion of 60 dB(A) therefore applies with reference to TM-EIAO 70 dB(A)
criterion for schools and taking account of the minus 10 dB(A) requirement
under the NCO TM-Places. Following
the same principle for groundborne noise criteria, groundborne construction
noise levels inside domestic premises relying on opened window for ventilation
will be limited to 65 dB(A), with reference to the daytime airborne noise
criterion of 75 dB(A) in accordance with TM-EIAO.
3.2.10
The Action and Limit levels for
construction noise are defined in Table
3‑7. If
non-compliance of the criteria occurs, actions in accordance with the Action
Plan in Table
3‑8 would be carried out.
|
Time Period |
Action |
Limit |
|
0700 – 1900 hrs on normal weekdays |
When one documented complaint is received |
75 dB(A)* |
Table 3‑7 Action
& Limit Levels for Noise
|
Event |
Action |
|||
|
ET Leader |
IEC |
SOR |
Contractor |
|
|
Action Level |
1.
Notify IEC and the Contractor. 2.
Carry out investigation. 3.
Report the results of investigation to IEC and the Contractor. 4.
Discuss with the Contractor and formulate remedial measures. 5.
Increase monitoring frequency to check mitigation measures. |
1.
Review with analysed results submitted by ET. 2.
Review the proposed remedial measures by the Contractor and
advise SOR accordingly. 3.
Supervise the implement of remedial measures. |
1.
Confirm receipt of notification of exceedance in writing. 2.
Notify the Contractor. 3.
Require the Contractor to propose remedial measures for the
analysed noise problem. 4.
Ensure remedial measures are properly implemented. |
1.
Submit noise mitigation proposals to IEC. 2.
Implement noise mitigation proposals. |
|
Limit Level |
1.
Identify the source. 2.
Notify IEC, SOR, EPD and the Contractor. 3.
Repeat measurement to confirm findings. 4.
Increase monitoring frequency. 5.
Carry out analysis of Contractor’s working procedures to
determine possible mitigation to be implemented. 6.
Inform IEC, SOR, and EPD the causes & actions taken for the
exceedances. 7.
Assess effectiveness of the Contractor’s remedial actions and
keep IEC, EPD and SOR informed of the results. 8.
If exceedance stops, cease additional monitoring. |
1.
Discuss amongst SOR, ET Leader and the Contractor on the
potential remedial actions. 2.
Review the Contractor’s remedial actions whenever necessary to
assure their effectiveness and advise SOR accordingly. 3.
Supervise the implementation of remedial measures. |
1.
Confirm receipt of notification of exceedance in writing. 2.
Notify the Contractor. 3.
Require the Contractor to propose remedial measures for the
analysed noise problem. 4.
Ensure remedial measures are properly implemented. 5.
If exceedance continues, consider what activity of the work is
responsible and instruct the Contractor to stop that activity of work until
the exceedance is abated. |
1.
Take immediate action to avoid further exceedance. 2.
Submit proposals for remedial actions to IEC within 3 working
days of notification. 3.
Implement the agreed proposals. 4.
Resubmit proposals if problem still not under control. 5.
Stop the relevant activity of works as determined by the SOR
until the exceedance is abated. |
Table 3‑8 Event/Action
Plan for Noise
3.3.1
As
there is no dredging or reclamation required for the project, the water quality
impact would be insignificant with the protection measures recommended in
Section 5.6 of the EIA report.
However in view of the sensitive nature of the rivers/streams and
bathing beaches in the Study Area, it is suggested that a programme of monitoring
should be established to confirm the mitigation measures are protecting these
water bodies.
3.3.2 Monitoring for Dissolved Oxygen (DO), temperature, turbidity, pH and suspended solids (SS) should be undertaken at designated monitoring locations. It should be noted that DO, temperature, turbidity and pH should be measured in-situ whereas SS is assayed in a laboratory.
3.3.3 In association with the water quality parameters, other relevant data should also be measured, such as monitoring location/position, time, weather conditions, and any special phenomena and description of work underway at the construction site etc.
3.3.4
In accordance with the EM&A Manual, the water quality
monitoring for all specified parameters shall be measured at all designated
monitoring locations including control points at an interval of 3 days per
week. DO, temperature, turbidity, pH and SS shall be undertaken at designated
monitoring locations.
3.3.5
It should be noted that water samples for all monitoring
parameters should be collected, stored, preserved and analysis according to
Standard Methods, APHA 17 ed. and/or methods agreed by the Director of
Environmental Protection.
3.3.6
Each
sample shall be analysed in accordance with the APHA Standard Methods for the
Examination of Water and Wastewater, 18th edition, or an equivalent method
approved by the EPD. If an
in-house or non-standard method is proposed, details of the method verification
may require to be submitted to the EPD.
In any circumstance, the sample testing should comply with a
comprehensive quality assurance and quality control programme. The laboratory should be prepared to
demonstrate the quality programmes to the EPD when requested.
3.3.7
All the water samples collected should be transferred
to clearly labelled and
pre-cleaned sample containers with necessary preservatives immediately after
collection. The sample containers
should be provided by a HOKLAS accredited laboratory. Sufficient quantity of samples should be collected for all
laboratory analyses. Following sampling, samples should be
stored in a cool box at temperature of between 0 and 4oC, and
transported to the laboratory within the sample retention time as advised by
the laboratory under proper chain-of-custody system. The water quality monitoring equipment used during the
reporting month is shown in Table
3‑9 below.
|
Equipment Type |
Manufacturer |
Model |
Quantity |
|
pH / DO / Temperature
Meter |
WTW |
PH/Oxi 340i |
1 |
|
Tuibidimeter |
EUTECH |
TN-100 |
1 |
Table 3‑9 Water
Quality Monitoring Equipment
3.3.8
All pH
meters, DO meters and turbidimeters shall be checked and calibrated prior to
use. DO meters and turbidimeters
shall be calibrated by a laboratory accredited under HOKLAS or any other
international accreditation scheme, and subsequently re-calibrated at 3 monthly
intervals throughout all stages of the water quality monitoring. Responses of sensors and electrodes
shall be checked with certified standard solutions before each use. Wet bulb calibrations for all DO meters
shall be carried out before measurement at each monitoring location. For the on site calibration of field
equipment, BS 127:1993, "Guide to field and on-site test methods for the
analysis of waters" should be observed. The calibration certificates are included in Appendix F.
3.3.9
Four designated monitoring locations were identified in the contract specific EM&A
Manual for water quality monitoring. While the
construction of the outfall does not require dredging or reclamation,
monitoring of water quality is only required during which the rip rap is
placed. These four monitoring stations are listed in Table 3‑10
below and shown in Appendix G.
|
Monitoring Station ID |
Name of Premises |
|
I-1 |
Intake I-1 |
|
I-1-C |
Control of Intake I-1 |
|
I-2 |
Intake I-2 |
|
I-2-C |
Control of Intake I-2 |
|
I-3 |
Intake I-3 |
|
I-3-C |
Control of Intake I-3 |
|
O-1 (FT) |
Outfall 1During Flood Tide |
|
O-1 (ET) |
Outfall 1During Ebb Tide |
|
O-1-C (FT) |
Control of Outfall O-1 During Flood Tide |
|
O-1-C (ET) |
Control of Outfall O-1 During Ebb Tide |
Table 3‑10 Water
Quality Monitoring Locations
3.3.10
Note that there are two control stations for
Outfall O-1, one for sampling during flood tide and one for sampling during ebb
tide. Only one of those control
stations for Outfall O-1 shall be sampled during each sampling. Control station to be sampled will be
determined based on the tidal information provided by the Hong Kong
Observatory.
3.3.11 The Action and Limit levels for water quality monitoring parameters are defined in Table 3‑11. In case of any exceedance, appropriate actions will be undertaken in accordance with the Event and Action Plan as described in Table 3‑12.
|
Parameters |
Action |
Limit |
|
DO in mg/l (Surface,
Middle & Bottom) |
Surface & Middle 5%-ile of baseline data for surface and middle
layer. Bottom 5%-ile of baseline data for bottom layer. |
Surface & Middle 4mg/l except 5mg/l for FCZ or 1%-ile of baseline data for surface and middle
layer Bottom 2mg/l or 1%-ile of baseline data for bottom layer |
|
SS
in mg/l (depth-averaged) |
95%-ile
of baseline data or 120% of upstream control station’s SS at the same tide of
the same day |
99%-ile
of baseline or 130% of upstream control station’s SS at the same tide of the
same day and specific sensitive receiver water quality requirements (e.g.
required suspended solids levels for concerned sea water intakes) |
|
Turbidity
(Tby) in NTU (depth-averaged) |
95%-ile
of baseline data or 120% of upstream control station’s Tby at the same tide
of the same day |
99%-ile
of baseline or 130% of upstream control station’s Tby at the same tide of the
same day |
Notes:
·
For DO, non-compliance of the water
quality limits occurs when monitoring result is lower than the limits.
·
For SS and Tby, non-compliance of the
water quality limits occurs when monitoring result is higher than the limits.
·
All the figures given in the table are
used for reference only and the EPD may amend the figures whenever it is
considered as necessary.
Table 3‑11 Action/Limit
Levels for Water Quality
|
Event |
ET Leader |
IEC |
SOR |
Contractor |
|
Action Level being exceeded by one sampling day |
1. Repeat
in-situ measurement to confirm finding; 2. Identify
source(s) of impact; 3. Inform
IEC and Contractor; 4. Check
monitoring data, all plant, equipment and Contractor’s working methods; 5. Discuss
mitigation measures with IEC and Contractor; and 6. Repeat
measurement on next day of exceedance. |
1. Discuss
with ET and Contractor on the mitigation measures; 2. Review
proposals on mitigation measures submitted by Contractor and advise the SOR
accordingly; and 3. Assess
the effectiveness of the implemented mitigation measures. |
1. Discuss
with IEC on the proposed mitigation measures; and 2. Make
agreement on the mitigation measures to be implemented. |
1. Inform
the SOR and confirm notification of the non-compliance in writing; 2. Rectify
unacceptable practice; 3. Check
all plant and equipment; 4. Consider
changes of working methods; 5. Discuss
with ET and IEC and propose mitigation measures to IEC and SOR; and 6. Implement
the agreed mitigation measures. |
|
Action Level being exceeded by more than one consecutive sampling day |
1. Repeat
in-situ measurement to confirm finding; 2. Identify
source(s) of impact; 3. Inform
IEC and Contractor; 4. Check
monitoring data, all plant, equipment and Contractor’s working methods; 5. Discuss
mitigation measures with IEC and Contractor; 6. Ensure
mitigation measures are implemented; 7. Prepare
to increase the monitoring frequency to daily; and 8. Repeat
measurement on next day of exceedance. |
1. Discuss
with ET and Contractor on the mitigation measures; 2. Review
proposals on mitigation measures submitted by Contractor and advise the SOR
accordingly; and 3. Assess
the effectiveness of the implemented mitigation measures. |
1. Discuss
with IEC on the proposed mitigation measures; 2. Make
agreement on the mitigation measures to be implemented; and 3. Assess
the effectiveness of the implemented mitigation measures. |
1. Inform
the Engineer and confirm notification of the non-compliance in writing; 2. Rectify
unacceptable practice; 3. Check
all plant and equipment; 4. Consider
changes of working methods; 5. Discuss
with ET and IEC and propose mitigation measures to IEC and SOR within 3
working days; and 6. Implement
the agreed mitigation measures. |
|
Limit Level being exceeded by one sampling day |
1. Repeat
in-situ measurement to confirm finding; 2. Identify
source(s) of impact; 3. Inform
IEC, Contractor and EPD; 4. Check
monitoring data, all plant, equipment and Contractor’s working methods; 5. Discuss
mitigation measures with IEC, SOR and Contractor; 6. Ensure
mitigation measures are implemented; and 7. Increase
the monitoring frequency to daily until no exceedance of Limit level. |
1. Discuss
with ET and Contractor on the mitigation measures; 2. Review
proposals on mitigation measures submitted by Contractor and advise the SOR
accordingly; and 3. Assess
the effectiveness of the implemented mitigation measures. |
1. Discuss
with IEC, ET and Contractor on the proposed mitigation measures; and 2. Request
Contractor to critically review the working methods; 3. Make
agreement on the mitigation measures to be implemented; and 4. Assess
the effectiveness of the implemented mitigation measures. |
1. Inform
the Engineer and confirm notification of the non-compliance in writing; 2. Rectify
unacceptable practice; 3. Check
all plant and equipment; 4. Consider
changes of working methods; 5. Discuss
with ET and IEC and SOR and propose mitigation measures to IEC and SOR within
3 working days; and 6. Implement
the agreed mitigation measures. |
|
Limit Level being exceeded by more than one
consecutive sampling day |
1. Repeat
in-situ measurement to confirm finding; 2. Identify
source(s) of impact; 3. Inform
IEC, Contractor and EPD; 4. Check
monitoring data, all plant, equipment and Contractor’s working methods; 5. Discuss
mitigation measures with IEC, SOR and Contractor; 6. Ensure
mitigation measures are implemented; and 7. Increase
the monitoring frequency to daily until no exceedance of Limit level for two
consecutive days. |
1. Discuss
with ET and Contractor on the mitigation measures; 2. Review
proposals on mitigation measures submitted by Contractor and advise the SOR
accordingly; and 3. Assess
the effectiveness of the implemented mitigation measures. |
1. Discuss
with IEC, ET and Contractor on the proposed mitigation measures; and 2. Request
Contractor to critically review the working methods; 3. Make
agreement on the mitigation measures to be implemented; 4. Assess
the effectiveness of the implemented mitigation measures; and 5. Consider
and instruct, if necessary, the Contractor to slow down or to stop all or
part of the marine work until no exceedance of Limit Level. |
1. Inform
the SOR and confirm notification of the non-compliance in writing; 2. Rectify
unacceptable practice; 3. Check
all plant and equipment; 4. Consider
changes of working methods; 5. Discuss
with ET and IEC and SOR and propose mitigation measures to IEC and SOR within
3 working days; 6. Implement
the agreed mitigation measures; and 7. As
directed by the Engineer, to slow down or to stop all or part of the marine
work or construction activities. |
Table 3‑12 Event/Action
Plan for Water Quality
4.1.1
The
air quality monitoring schedule of the reporting period is given in Appendix
H.
4.1.2
Results of 1-hours TSP level
are shown in Table
4‑1. All
measurements were recorded to the nearest 0.1mg/m3 and presented in round numbers in this report. Detail results including weather
conditions, and graphical presentations are presented in Appendix I.
|
Station |
Monitoring Date |
Monitoring Result (mg/m3) |
Action/Limit Levels (mg/m3) |
|
ASR 1 |
03-Dec-08 |
30.2 |
307/500 |
|
23.9 |
|||
|
18.9 |
|||
|
09-Dec-08 |
10.1 |
||
|
45.3 |
|||
|
67.9 |
|||
|
15-Dec-08 |
150.8 |
||
|
139.8 |
|||
|
245.3 |
|||
|
20-Dec-08 |
60.1 |
||
|
80.9 |
|||
|
35.6 |
|||
|
23-Dec-08 |
47.8 |
||
|
144.7 |
|||
|
150.8 |
|||
|
29-Dec-08 |
63.8 |
||
|
55.2 |
|||
|
80.9 |
|||
|
ASR 3 |
03-Dec-08 |
32.0 |
327/500 |
|
48.7 |
|||
|
52.5 |
|||
|
09-Dec-08 |
67.9 |
||
|
61.5 |
|||
|
85.9 |
|||
|
15-Dec-08 |
94.4 |
||
|
99.2 |
|||
|
104.0 |
|||
|
20-Dec-08 |
68.1 |
||
|
135.0 |
|||
|
77.7 |
|||
|
23-Dec-08 |
69.3 |
||
|
47.8 |
|||
|
57.4 |
|||
|
29-Dec-08 |
19.1 |
||
|
29.9 |
|||
|
23.9 |
|||
|
ASR
8 |
03-Dec-08 |
37.2 |
337/500 |
|
57.8 |
|||
|
50.1 |
|||
|
09-Dec-08 |
72.8 |
||
|
92.3 |
|||
|
114.2 |
|||
|
15-Dec-08 |
90.3 |
||
|
59.8 |
|||
|
54.9 |
|||
|
20-Dec-08 |
54.9 |
||
|
20.8 |
|||
|
118.4 |
|||
|
23-Dec-08 |
89.1 |
||
|
79.4 |
|||
|
90.3 |
|||
|
29-Dec-08 |
105.0 |
||
|
81.8 |
|||
|
80.6 |
|||
|
ASR 9 |
03-Dec-08 |
31.8 |
329/500 |
|
103.3 |
|||
|
67.5 |
|||
|
09-Dec-08 |
203.9 |
||
|
140.4 |
|||
|
156.2 |
|||
|
15-Dec-08 |
165.2 |
||
|
74.0 |
|||
|
78.0 |
|||
|
20-Dec-08 |
76.6 |
||
|
68.7 |
|||
|
51.5 |
|||
|
23-Dec-08 |
81.9 |
||
|
83.2 |
|||
|
109.7 |
|||
|
29-Dec-08 |
76.6 |
||
|
87.2 |
|||
|
39.6 |
Note: Italic indicates the occurrence of exceedance of Action level
Bold indicates the occurrence of exceedance of Limit Level
Table 4‑1 Air Quality
Monitoring Results
4.1.3
No project related exceedance
was recorded in the reporting month.
4.1.4
During the reporting month, all
monitoring results were below Action and Limit Levels. Dust suppression
measures were effective. Details of the investigation can be referred to the
notifications of exceedances as enclosed in Appendix J.
The noise monitoring schedule of the reporting period is given in
Appendix H. Results of measured
noise level, in terms of Leq (30min), during the construction are shown in Table 4‑2. All measurements including L10 and L90 are recorded
to the nearest 0.1 dB(A) and presented in round numbers in this report. Detail results including weather
conditions and graphical presentation are presented in Appendix I.
|
Station |
Monitoring Date |
Leq (30 min) dB(A) |
Limit Levels dB(A) |
|
NSR 1 |
3-Dec-08 |
62 |
70 |
|
9-Dec-08 |
64 |
65 (1) |
|
|
15-Dec-08 |
64 |
65 (1) |
|
|
23-Dec-08 |
67 |
70 |
|
|
29-Dec-08 |
65 |
||
|
NSR 3 |
3-Dec-08 |
60 |
75 |
|
9-Dec-08 |
62 |
||
|
15-Dec-08 |
66 |
||
|
23-Dec-08 |
61 |
||
|
29-Dec-08 |
62 |
||
|
NSR 6 |
3-Dec-08 |
61 |
|
|
9-Dec-08 |
60 |
||
|
15-Dec-08 |
61 |
||
|
23-Dec-08 |
61 |
||
|
29-Dec-08 |
62 |
||
|
NSR 8 |
3-Dec-08 |
61 |
|
|
9-Dec-08 |
62 |
||
|
15-Dec-08 |
64 |
||
|
23-Dec-08 |
64 |
||
|
29-Dec-08 |
63 |
||
|
NSR 9 |
3-Dec-08 |
62 |
|
|
9-Dec-08 |
63 |
||
|
15-Dec-08 |
62 |
||
|
23-Dec-08 |
63 |
||
|
29-Dec-08 |
65 |
Table 4‑2 Noise
Monitoring Results
4.2.1
No exceedances of Action /
Limit Level were recorded during the reporting month.
4.3.1
The water quality monitoring
schedule of the reporting period is given in Appendix H. In accordance with the monitoring
results, four exceedances were identified. Summaries of exceedances for water
quality monitoring are provided in Tables 4-3 to 4-5.
|
Parameter |
Action
Level Exceedance |
Limit Level
Exceedance |
|
DO |
Nil |
Nil |
|
Turbidity |
Nil |
Nil |
|
SS |
Two recorded on 5 and 8 December |
One recorded on 19 December |
|
Total |
Two |
One |
Table 4‑3 Summary
of Exceedances for I-1
|
Parameter |
Action
Level Exceedance |
Limit Level
Exceedance |
|
DO |
Nil |
Nil |
|
Turbidity |
Nil |
Nil |
|
SS |
Nil |
Nil |
|
Total |
Nil |
Nil |
Table 4‑4 Summary
of Exceedances for I-2
|
Parameter |
Action
Level Exceedance |
Limit Level
Exceedance |
|
DO |
Nil |
Nil |
|
Turbidity |
Nil |
Nil |
|
SS |
One recorded on 29 December |
Nil |
|
Total |
One |
Nil |
Table 4‑5
Summary
of Exceedances for I-3
4.3.2
Results of measured water
quality parameters during the reporting month are shown in Table 4‑6 and detailed results including weather conditions and
graphical presentations are enclosed in Appendix I.
4.3.3
The exceedance of Control
Action Level of SS (120% higher than I-1-C) recorded at I-1 on 5 December was
below both baseline Action and Limit Levels and was within the range of
baseline SS concentration. Pipe piling and levelling of concrete platform were
undertaken during the measurement and no direct disturbance was observed. The exceedance
considered to be contributed by natural variation and no action was therefore
required.
4.3.4
The exceedance of Control
Action Level of SS (120% higher than I-1-C) recorded at I-1 on 8 December was
below both baseline Action and Limit Levels and was within the range of
baseline SS concentration. Pipe
piling and delivery of concrete block were undertaken during the measurement
and no direct disturbance was observed.
Thus, the exceedance is considered to be contributed by natural
variation and no action should be required.
4.3.5
The exceedance of Limit Level
of SS recorded at I-1 on 19 December was over Baseline Action and Limit Levels,
but was below both 120% and 130% of the measured level at Control Station. No
direct disturbance was observed contributed by project construction activities
including site tidiness and drilling temporary pipe pile. There is no evidence
to show the exceedance is project-related. Thus, no action is required. No
exceedance was recorded in the consecutive monitoring on 22 December.
4.3.6
The exceedance of Action Level
of SS recorded at I-3 on 29 December was over Baseline Action Level, but the
measured SS level was well below both 120% and 130% of the measured level at
Control Station. No direct
disturbance was observed contributed by project construction activities
including site tidiness during the day of sampling. There is no evidence to
show the exceedance is project-related. Thus, no action is required.
4.3.7
Details of the above mentioned
investigations could be referred to the notifications of exceedances as
enclosed in Appendix J, which have been provided to the IEC for review.
|
Station |
Date |
Temperature |
DO (mg/L) |
Action/Limit Level for DO (mg/L) |
pH |
Turbidity (NTU) |
Action/Limit Level for Turbidity (NTU) |
SS (mg/L) |
Action/Limit
Level for SS (mg/L) |
|
I-1 |
1-Dec-08 |
17.60 |
4.79 |
3.42 / 3.34 |
7.59 |
3.37 |
9.75 / 12.47 |
2.0 |
8.85 / 10.17 |
|
|
3-Dec-08 |
17.70 |
4.65 |
|
8.22 |
5.34 |
|
8.5 |
|
|
|
5-Dec-08 |
18.20 |
4.91 |
|
7.29 |
4.88 |
|
6.9 |
|
|
|
8-Dec-08 |
17.20 |
4.81 |
|
7.78 |
3.34 |
|
4.8 |
|
|
|
10-Dec-08 |
17.20 |
4.47 |
|
7.73 |
5.23 |
|
5.4 |
|
|
|
12-Dec-08 |
17.40 |
4.73 |
|
7.73 |
4.30 |
|
3.7 |
|
|
|
15-Dec-08 |
17.60 |
4.88 |
|
8.00 |
4.26 |
|
2.0 |
|
|
|
17-Dec-08 |
19.05 |
4.74 |
|
8.00 |
4.14 |
|
3.8 |
|
|
|
19-Dec-08 |
18.30 |
4.79 |
|
8.11 |
5.13 |
|
11.1 |
|
|
|
22-Dec-08 |
17.30 |
4.72 |
|
8.45 |
4.15 |
|
2.0 |
|
|
|
24-Dec-08 |
17.30 |
5.33 |
|
7.73 |
3.54 |
|
2.0 |
|
|
|
27-Dec-08 |
16.50 |
4.63 |
|
7.77 |
5.20 |
|
2.9 |
|
|
|
29-Dec-08 |
20.50 |
4.91 |
|
7.56 |
6.35 |
|
7.5 |
|
|
|
31-Dec-08 |
18.5 |
4.69 |
|
7.70 |
4.39 |
|
2.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-1-C |
1-Dec-08 |
17.60 |
4.82 |
- / - |
8.37 |
3.43 |
- / - |
2.0 |
- / - |
|
|
3-Dec-08 |
17.40 |
4.43 |
|
8.21 |
5.56 |
|
7.8 |
|
|
|
5-Dec-08 |
18.05 |
4.86 |
|
7.62 |
5.05 |
|
5.7 |
|
|
|
8-Dec-08 |
17.40 |
4.98 |
|
7.78 |
3.46 |
|
3.9 |
|
|
|
10-Dec-08 |
17.20 |
4.83 |
|
7.76 |
5.35 |
|
4.9 |
|
|
|
12-Dec-08 |
17.20 |
4.67 |
|
7.73 |
4.67 |
|
4.1 |
|
|
|
15-Dec-08 |
17.40 |
4.92 |
|
8.01 |
4.37 |
|
2.0 |
|
|
|
17-Dec-08 |
18.70 |
4.51 |
|
8.15 |
4.15 |
|
4.3 |
|
|
|
19-Dec-08 |
18.40 |
4.75 |
|
8.06 |
5.22 |
|
11.0 |
|
|
|
22-Dec-08 |
17.40 |
4.77 |
|
8.32 |
4.39 |
|
2.0 |
|
|
|
24-Dec-08 |
17.30 |
5.12 |
|
7.77 |
5.12 |
|
2.0 |
|
|
|
27-Dec-08 |
16.70 |
4.64 |
|
7.83 |
5.23 |
|
3.0 |
|
|
|
29-Dec-08 |
20.70 |
4.91 |
|
7.77 |
6.45 |
|
7.7 |
|
|
|
31-Dec-08 |
18.20 |
4.61 |
|
7.71 |
4.48 |
|
2.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-2 |
1-Dec-08 |
17.60 |
4.86 |
3.66 / 3.63 |
7.66 |
3.50 |
6.63 / 6.99 |
2.0 |
7.68 / 8.34 |
|
|
3-Dec-08 |
16.20 |
4.64 |
|
8.42 |
3.49 |
|
2.0 |
|
|
|
5-Dec-08 |
18.00 |
4.62 |
|
7.72 |
4.74 |
|
2.0 |
|
|
|
8-Dec-08 |
17.50 |
4.74 |
|
7.74 |
3.21 |
|
2.0 |
|
|
|
10-Dec-08 |
17.80 |
4.58 |
|
8.13 |
3.32 |
|
2.0 |
|
|
|
12-Dec-08 |
17.50 |
4.72 |
|
7.61 |
4.26 |
|
2.0 |
|
|
|
15-Dec-08 |
17.50 |
4.80 |
|
8.12 |
4.22 |
|
2.0 |
|
|
|
17-Dec-08 |
19.70 |
4.58 |
|
7.56 |
4.24 |
|
2.0 |
|
|
|
19-Dec-08 |
17.50 |
4.47 |
|
7.66 |
3.19 |
|
2.0 |
|
|
|
22-Dec-08 |
17.80 |
4.63 |
|
7.58 |
3.75 |
|
2.0 |
|
|
|
24-Dec-08 |
17.00 |
4.85 |
|
7.51 |
4.28 |
|
2.0 |
|
|
|
27-Dec-08 |
16.30 |
4.85 |
|
7.98 |
4.32 |
|
2.3 |
|
|
|
29-Dec-08 |
21.30 |
3.67 |
|
7.80 |
4.21 |
|
6.4 |
|
|
|
31-Dec-08 |
18.10 |
4.79 |
|
7.73 |
4.31 |
|
2.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-2-C |
1-Dec-08 |
17.70 |
4.77 |
- / - |
7.64 |
3.59 |
- / - |
2.0 |
- / - |
|
|
3-Dec-08 |
16.30 |
4.76 |
|
8.32 |
3.54 |
|
2.0 |
|
|
|
5-Dec-08 |
18.20 |
4.68 |
|
7.71 |
4.85 |
|
2.0 |
|
|
|
8-Dec-08 |
17.50 |
4.85 |
|
7.77 |
3.34 |
|
2.0 |
|
|
|
10-Dec-08 |
17.80 |
4.81 |
|
8.14 |
3.40 |
|
2.0 |
|
|
|
12-Dec-08 |
17.50 |
4.73 |
|
7.63 |
4.35 |
|
2.0 |
|
|
|
15-Dec-08 |
17.80 |
4.75 |
|
8.05 |
4.43 |
|
2.0 |
|
|
|
17-Dec-08 |
19.20 |
4.45 |
|
7.62 |
4.39 |
|
2.0 |
|
|
|
19-Dec-08 |
17.25 |
4.43 |
|
7.64 |
3.22 |
|
2.0 |
|
|
|
22-Dec-08 |
17.60 |
4.52 |
|
7.61 |
4.02 |
|
2.0 |
|
|
|
24-Dec-08 |
17.10 |
4.67 |
|
7.53 |
4.34 |
|
2.0 |
|
|
|
27-Dec-08 |
16.50 |
5.05 |
|
7.99 |
4.39 |
|
2.7 |
|
|
|
29-Dec-08 |
21.10 |
4.02 |
|
7.83 |
4.38 |
|
6.2 |
|
|
|
31-Dec-08 |
18.00 |
4.74 |
|
7.69 |
4.37 |
|
2.0 |
|
|
I-3 |
1-Dec-08 |
17.60 |
4.96 |
3.65
/ 3.51 |
7.67 |
3.23 |
3.99
/ 4.18 |
2.0 |
6.13
/ 7.23 |
|
|
3-Dec-08 |
17.70 |
5.16 |
|
8.43 |
3.49 |
|
2.0 |
|
|
|
5-Dec-08 |
18.70 |
5.91 |
|
7.82 |
3.22 |
|
2.0 |
|
|
|
8-Dec-08 |
17.40 |
4.96 |
|
7.77 |
3.39 |
|
2.0 |
|
|
|
10-Dec-08 |
17.70 |
4.50 |
|
7.75 |
3.19 |
|
2.0 |
|
|
|
12-Dec-08 |
17.50 |
4.76 |
|
7.20 |
3.22 |
|
2.0 |
|
|
|
15-Dec-08 |
17.30 |
5.05 |
|
8.12 |
3.54 |
|
2.0 |
|
|
|
17-Dec-08 |
18.60 |
5.01 |
|
8.33 |
3.19 |
|
2.0 |
|
|
|
19-Dec-08 |
17.25 |
4.72 |
|
8.12 |
3.19 |
|
2.0 |
|
|
|
22-Dec-08 |
16.90 |
4.39 |
|
7.64 |
3.76 |
|
2.0 |
|
|
|
24-Dec-08 |
17.95 |
4.99 |
|
8.73 |
3.44 |
|
2.0 |
|
|
|
27-Dec-08 |
14.40 |
4.52 |
|
7.60 |
3.47 |
|
2.2 |
|
|
|
29-Dec-08 |
20.20 |
4.59 |
|
7.73 |
3.20 |
|
6.6 |
|
|
|
31-Dec-08 |
18.50 |
4.99 |
|
7.44 |
3.43 |
|
2.0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
I-3-C |
1-Dec-08 |
17.60 |
4.91 |
- / - |
7.62 |
3.25 |
- / - |
2.0 |
- / - |
|
|
3-Dec-08 |
17.50 |
4.52 |
|
8.32 |
3.56 |
|
2.0 |
|
|
|
5-Dec-08 |
18.80 |
4.77 |
|
7.77 |
3.40 |
|
2.0 |
|
|
|
8-Dec-08 |
17.40 |
4.79 |
|
7.72 |
3.43 |
|
2.0 |
|
|
|
10-Dec-08 |
17.70 |
4.86 |
|
7.76 |
3.12 |
|
2.0 |
|
|
|
12-Dec-08 |
17.80 |
4.80 |
|
7.25 |
3.42 |
|
2.0 |
|
|
|
15-Dec-08 |
17.50 |
5.18 |
|
8.11 |
3.21 |
|
2.0 |
|
|
|
17-Dec-08 |
18.50 |
4.62 |
|
8.35 |
3.25 |
|
2.0 |
|
|
|
19-Dec-08 |
17.50 |
4.81 |
|
8.00 |
3.24 |
|
2.0 |
|
|
|
22-Dec-08 |
17.00 |
4.38 |
|
7.61 |
3.64 |
|
2.0 |
|
|
|
24-Dec-08 |
17.80 |
4.91 |
|
8.71 |
3.48 |
|
2.0 |
|
|
|
27-Dec-08 |
14.50 |
4.38 |
|
7.62 |
3.52 |
|
2.0 |
|
|
|
29-Dec-08 |
20.40 |
4.54 |
|
7.60 |
3.25 |
|
7.2 |
|
|
|
31-Dec-08 |
18.70 |
4.81 |
|
7.44 |
3.53 |
|
2.0 |
|
Note: Italic indicates the occurrence
of exceedance of Action level.
Bold
indicates the occurrence of exceedance of Limit level.
Table 4‑6 Water
Quality Monitoring Results
4.4.1
Table 4‑7 summarises the project-related exceedance results
recorded in December 2008. Note that exceedances that
are considered not related to the construction activities are not included in
this table.
|
Environmental
Monitoring |
Total
No. of Measurement |
Action
Level Exceedance |
% of
Action Level Exceedance |
Limit
Level Exceedance |
% of
Limit Level Exceedance |
|
Air Quality |
72 |
0 |
0 |
0 |
0 |
|
Noise |
25 |
0 |
0 |
0 |
0 |
|
Water |
72 |
0 |
0 |
0 |
0 |
Table 4‑7 Summary of
Project-Related Exceedances
5.1.1
The status of waste management
is summarized in Table 5‑1 below.
|
Status of waste management |
Quantity |
|
Inert C&D Material Disposed of to Public Fill
at Tuen Mun (m3) |
144.1 |
|
Inert C&D Material Reused in other Contracts
(m3) |
10 |
|
Metals Generated (kg) |
5 |
|
Paper / Cardboard Packaging (kg) |
150 |
|
Plastics
(kg) |
Nil |
|
Chemical
Waste (kg) |
Nil |
|
General
Waste Disposed of to NENT Landfill (m3) |
6.2 |
Table 5‑1 Waste
Generated in December 2008
6.1.1
ET has carried out two site
inspections in the reporting month.
All observations together with the appropriate recommended mitigation
measures where necessary were recorded in the audit checklists that were passed
to the Contractor. Major
environmental deficiencies observed during site inspection/audits and
recommendation, which were made by the ET, are summarised in Table 6‑1 below.
No non-compliance was observed.
|
Inspection Date |
Observation |
Recommendation |
Status |
|
5 December 2008 |
1.
At Intake I-3,
tarpaulin that used for the grouting plant was not properly placed. 2.
At Intake 2,
insufficient site cleaning and tidying were observed. |
1.
The Contractor was
requested to maintain the tarpaulin properly. 2.
The Contractor was
requested to maintain the site cleaning and tidying. |
1.
During site inspection
on 19 December, tarpaulin was maintained properly. (Closed) 2.
Proper site cleaning
and tidying was observed on 19 December. (Closed) |
|
19 December 2008 |
A pile of exposed debris was observed at the Intake I-3. |
The Contractor
was requested to either dispose debris off regularly or cover it with
tarpaulin. |
The outstanding observation would be followed up
in next month site inspection. (Outstanding) |
Table 6‑1 Site
Inspection by ET
7.1.1
A
complaint hotline at 9850 3241 of the Contractor has been established for the
Project.
7.1.2
No complaints were received
during the reporting month.
Cumulative statistics of environmental complaints are shown in Table 7‑1.
|
Complaints
Received in the Reporting Month |
Cumulative
Number of Complaints |
|
0 |
0 |
Table 7‑1 Cumulative Statistic of Environmental Complaint
8.1.1
No
summons and successful prosecution was received during the reporting month.
8.1.2
Cumulative
statistics of Notification of Summons, Successful Prosecutions and Convictions
are shown in Table
8‑1.
|
Notification
of Summons |
Successful Prosecution |
||
|
December
08 |
Cumulative |
December 08 |
Cumulative |
|
0
|
0 |
0 |
0 |
Table 8‑1 Cumulative Statistics of Notification of Summons and Successful
Prosecutions
9.1.1
The forecast of construction
works for the upcoming three months are:
§
Site
clearance at I-1, I-2, I-3 and Outfall;
§
Hoarding
& fencing erection at I-3 and Outfall;
§
Tree
transplanting at I-1, I-3 and Outfall;
§
Slope
stabilization at Outfall;
§
Soil
nailing at I-3 and Outfall;
§
Pipe
pile at I-1;
§
Relocation
of verified boulder at Outfall;
§
Formation
of access road at Outfall;
§
Pre-bore
H-piling at I-3;
§
RCD at
I-2.
|
Organization Chart |
|
Construction Programme |
|
Implementation Status of Environmental Mitigation Measures |
|
Status of License and Permit |
|
Calibration Certificates |
|
Monitoring Locations |
|
EM&A Schedule |
|
Monitoring Results |