        "Financial Year":"2018-19",
        "PWP Item No.":"4164CD",
        "Project Title":"Drainage improvement in Northern New Territories - construction of a box culvert underneath Castle Peak Road at San Tin",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4376DS",
        "Project Title":"Trunk sewerage at Lau Fau Shan",
        "Actual Expenditure (HK$ million)":0.002
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4162CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak nullah from Po Kong Village Road to Tung Kwong Road - stage 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4276DS",
        "Project Title":"Sha Tin sewage treatment works stage 3 extension",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4176DS",
        "Project Title":"Central, Western and Wan Chai West Sewerage, consultants’ fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4327DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 2 phase 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4333DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 2 phase 2A works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4370DS",
        "Project Title":"Village sewerage at Wang Chau of Yuen Long",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4064CD",
        "Project Title":"Rural Drainage Rehabilitation Scheme – drainage rehabilitation works at Sha Po Tsuen Stream",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4092CD",
        "Project Title":"Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai drainage improvements, stage 1, phase 2B – remaining works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4102CD",
        "Project Title":"Drainage Improvement in Tuen Mun and Sham Tseng – Package B",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.059
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":2.429
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":1.03
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4109CD",
        "Project Title":"Drainage improvement works in Shuen Wan, Tai Po",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4115CD",
        "Project Title":"Drainage improvement in Sha Tin and Tai Po – consultants’ fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.731
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4129CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.337
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4130CD",
        "Project Title":"Drainage improvement in Northern New Territories – package C – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.328
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4136CD",
        "Project Title":"Drainage improvement works in Sha Tin",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4137CD",
        "Project Title":"Drainage improvement for Ma Wat River at Kau Lung Hang",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4140CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Po Kong Village Road to Tung Kwong Road – remaining works",
        "Actual Expenditure (HK$ million)":158.997
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4141CD",
        "Project Title":"Drainage improvement works in Tai Po town area",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4143DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 2 phase 2B works",
        "Actual Expenditure (HK$ million)":1.22
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4145CD",
        "Project Title":"Upgrading of stormwater drains in Sheung Shui and Fanling",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4148CD",
        "Project Title":"Drainage improvement works in Ping Kong, Kau Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang areas",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":2.867
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4151CD",
        "Project Title":"Drainage improvement works in Lung Yeuk Tau, Kwan Tei South and Leng Tsai, Fanling",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4152CD",
        "Project Title":"Drainage improvement works in upper Lam Tsuen River, She Shan River, upper Tai Po River, Ping Long and Kwun Hang",
        "Actual Expenditure (HK$ million)":0.609
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4153CD",
        "Project Title":"Drainage improvement works in Tai Po Tin and Ping Che of Ta Kwu Ling, and Man Uk Pin and Lin Ma Hang of Sha Tau Kok",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4156CD",
        "Project Title":"Drainage improvement in Ki Lun Tsuen, Ma Tso Lung, Ying Pun, Shek Tsai Leng and Sha Ling in New Territories",
        "Actual Expenditure (HK$ million)":1.943
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":58.003
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":50.391
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":1.051
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4215DS",
        "Project Title":"Yuen Long and Kam Tin sewerage and sewage disposal – Kam Tin trunk sewerage phase 1 and Au Tau trunk sewers",
        "Actual Expenditure (HK$ million)":0.118
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":2.326
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":1.712
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4230DS",
        "Project Title":"Outlying Islands sewerage, stage 1 phase 1 part 2 – Yung Shue Wan sewerage, sewage treatment works and outfall",
        "Actual Expenditure (HK$ million)":0.097
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4234DS",
        "Project Title":"Outlying Islands sewerage, stage 1 phase 2 – Sok Kwu Wan sewage collection, treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":0.097
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":5.766
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4238DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – environmental impact assessment, investigations, tunnel conveyance system design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon sewerage improvements and pollution control, stage II – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4329DS",
        "Project Title":"Upgrading of Pillar Point sewage treatment works",
        "Actual Expenditure (HK$ million)":0.167
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4332DS",
        "Project Title":"Lam Tsuen Valley sewerage, stage 2",
        "Actual Expenditure (HK$ million)":4.905
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4340DS",
        "Project Title":"Port Shelter sewerage stage 3 – Mang Kung Uk sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":336.098
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":1.866
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4348DS",
        "Project Title":"North District and Tolo Harbour sewerage, sewage treatment and disposal - regional sewerage works, part 1 – sewerage upgrade",
        "Actual Expenditure (HK$ million)":0.003
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4350DS",
        "Project Title":"Yuen Long and Kam Tin sewerage and sewage disposal - consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":2.447
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.161
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4364DS",
        "Project Title":"Lam Tsuen Valley sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":0.104
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.538
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":119.748
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4371DS",
        "Project Title":"Sewerage in western Tuen Mun",
        "Actual Expenditure (HK$ million)":23.797
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":5.336
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4373DS",
        "Project Title":"Lam Tsuen Valley sewerage, stage 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4374DS",
        "Project Title":"Tuen Mun sewerage, stage 1 – village sewerage in Tsing Chuen Wai and Tuen Tsz Wai (part)",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":3.856
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":0.318
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":2.799
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4379DS",
        "Project Title":"Feasibility study on relocation of Sha Tin sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":49.008
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":150.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":44.793
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4384DS",
        "Project Title":"Yuen Long and Kam Tin sewerage, stage 3 package 2",
        "Actual Expenditure (HK$ million)":0.935
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":0.012
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":13.931
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":108.019
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":4.435
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":11.041
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":33.88
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":56.088
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":30.111
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4396DS",
        "Project Title":"Sewerage in Nam Wa Po and Wai Tau Tsuen",
        "Actual Expenditure (HK$ million)":34.279
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4397DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – Lamma village sewerage phase 2, package 1",
        "Actual Expenditure (HK$ million)":27.417
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":3.519
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4401DS",
        "Project Title":"Feasibility study on relocation of Sham Tseng sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":4.122
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":1.741
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":1.771
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4404DS",
        "Project Title":"Tuen Mun sewerage – Castle Peak Road trunk sewer and Tuen Mun village sewerage",
        "Actual Expenditure (HK$ million)":104.311
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":90.169
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":38.124
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4410DS",
        "Project Title":"Trunk sewers at Hiram’s Highway",
        "Actual Expenditure (HK$ million)":6.4
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":493.703
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":19.015
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":135.547
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":21.88
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":4.2
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":0.219
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2018-19",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":2.1
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4140CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Po Kong Village Road to Tung Kwong Road – remaining works",
        "Actual Expenditure (HK$ million)":159.986
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":9.27
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4332DS",
        "Project Title":"Lam Tsuen Valley sewerage, stage 2",
        "Actual Expenditure (HK$ million)":2.49
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":290.503
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4064CD",
        "Project Title":"Rural Drainage Rehabilitation Scheme – drainage rehabilitation works at Sha Po Tsuen Stream",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4102CD",
        "Project Title":"Drainage Improvement in Tuen Mun and Sham Tseng – Package B",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.14
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":0.082
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4115CD",
        "Project Title":"Drainage improvement in Sha Tin and Tai Po – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.035
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4129CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.412
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4130CD",
        "Project Title":"Drainage improvement in Northern New Territories – package C – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4137CD",
        "Project Title":"Drainage improvement for Ma Wat River at Kau Lung Hang",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4148CD",
        "Project Title":"Drainage improvement works in Ping Kong, Kau Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang areas",
        "Actual Expenditure (HK$ million)":0.002
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.595
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4152CD",
        "Project Title":"Drainage improvement works in upper Lam Tsuen River, She Shan River, upper Tai Po River, Ping Long and Kwun Hang",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4156CD",
        "Project Title":"Drainage improvement in Ki Lun Tsuen, Ma Tso Lung, Ying Pun, Shek Tsai Leng and Sha Ling in New Territories",
        "Actual Expenditure (HK$ million)":0.263
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":1.984
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4401DS",
        "Project Title":"Feasibility study on relocation of Sham Tseng sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.643
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":25.82
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":6.85
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":139.983
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4143DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 2 phase 2B works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4215DS",
        "Project Title":"Yuen Long and Kam Tin sewerage and sewage disposal – Kam Tin trunk sewerage phase 1 and Au Tau trunk sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":3.098
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":1.389
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":6.309
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4238DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – environmental impact assessment, investigations, tunnel conveyance system design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon sewerage improvements and pollution control, stage II – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4329DS",
        "Project Title":"Upgrading of Pillar Point sewage treatment works",
        "Actual Expenditure (HK$ million)":1.762
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4340DS",
        "Project Title":"Port Shelter sewerage stage 3 – Mang Kung Uk sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4348DS",
        "Project Title":"North District and Tolo Harbour sewerage, sewage treatment and disposal - regional sewerage works, part 1 – sewerage upgrade",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4350DS",
        "Project Title":"Yuen Long and Kam Tin sewerage and sewage disposal - consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.111
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4364DS",
        "Project Title":"Lam Tsuen Valley sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":1.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":60.671
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4371DS",
        "Project Title":"Sewerage in western Tuen Mun",
        "Actual Expenditure (HK$ million)":4.153
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":4.123
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4373DS",
        "Project Title":"Lam Tsuen Valley sewerage, stage 1",
        "Actual Expenditure (HK$ million)":0.63
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4374DS",
        "Project Title":"Tuen Mun sewerage, stage 1 – village sewerage in Tsing Chuen Wai and Tuen Tsz Wai (part)",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":1.168
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":1.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":0.293
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":8.303
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":1.13
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.561
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":28.62
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":5.009
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4396DS",
        "Project Title":"Sewerage in Nam Wa Po and Wai Tau Tsuen",
        "Actual Expenditure (HK$ million)":8.828
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4397DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – Lamma village sewerage phase 2, package 1",
        "Actual Expenditure (HK$ million)":12.698
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":32.981
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":9.222
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4404DS",
        "Project Title":"Tuen Mun sewerage – Castle Peak Road trunk sewer and Tuen Mun village sewerage",
        "Actual Expenditure (HK$ million)":108.48
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4410DS",
        "Project Title":"Trunk sewers at Hiram’s Highway",
        "Actual Expenditure (HK$ million)":4.861
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":392.433
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":91.045
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":67.842
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":68.53
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":59.662
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":268.753
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":28.73
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":179.982
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":1.132
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":24.493
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":67.249
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":60.782
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":25.177
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":7.102
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":28.232
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":172.943
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":41.276
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4109CD",
        "Project Title":"Drainage improvement works in Shuen Wan, Tai Po",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4145CD",
        "Project Title":"Upgrading of stormwater drains in Sheung Shui and Fanling",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4434DS",
        "Project Title":"Village Sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2019-20",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4064CD",
        "Project Title":"Rural Drainage Rehabilitation Scheme – drainage rehabilitation works at Sha Po Tsuen Stream",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":1.8
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":217.991
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4115CD",
        "Project Title":"Drainage improvement in Sha Tin and Tai Po – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.508
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":6.3
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4129CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4130CD",
        "Project Title":"Drainage improvement in Northern New Territories – package C – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4140CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Po Kong Village Road to Tung Kwong Road – remaining works",
        "Actual Expenditure (HK$ million)":42.937
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.278
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4152CD",
        "Project Title":"Drainage improvement works in upper Lam Tsuen River, She Shan River, upper Tai Po River, Ping Long and Kwun Hang",
        "Actual Expenditure (HK$ million)":0.703
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":20.178
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":21.925
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":61.998
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4172CD",
        "Project Title":"Rehabilitation of underground stormwater drains – remaining works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":34.719
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":5.11
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":12.529
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":11.558
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4401DS",
        "Project Title":"Feasibility study on relocation of Sham Tseng sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.022
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":25.972
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4445DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – main caverns construction and upstream sewerage works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4143DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 2 phase 2B works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":5.19
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":8.036
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":2.141
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":6.031
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4238DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – environmental impact assessment, investigations, tunnel conveyance system design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon sewerage improvements and pollution control, stage II – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4329DS",
        "Project Title":"Upgrading of Pillar Point sewage treatment works",
        "Actual Expenditure (HK$ million)":0.551
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4332DS",
        "Project Title":"Lam Tsuen Valley sewerage, stage 2",
        "Actual Expenditure (HK$ million)":3.482
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4340DS",
        "Project Title":"Port Shelter sewerage stage 3 – Mang Kung Uk sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":117.142
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":92.351
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4348DS",
        "Project Title":"North District and Tolo Harbour sewerage, sewage treatment and disposal - regional sewerage works, part 1 – sewerage upgrade",
        "Actual Expenditure (HK$ million)":0.684
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.573
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4353DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – extension of sewerage system to other unsewered villages in Mui Wo",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4355DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Lamma village sewerage phase 2, package 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":3.15
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4364DS",
        "Project Title":"Lam Tsuen Valley sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":1.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":101.48
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":7.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4374DS",
        "Project Title":"Tuen Mun sewerage, stage 1 – village sewerage in Tsing Chuen Wai and Tuen Tsz Wai (part)",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":0.499
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":1.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":2.31
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":122.786
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":89.9
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":13.536
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":2.469
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.496
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":6.731
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":516.784
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":31.695
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":93.457
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":269.978
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":87.284
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":66.501
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":3.548
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4396DS",
        "Project Title":"Sewerage in Nam Wa Po and Wai Tau Tsuen",
        "Actual Expenditure (HK$ million)":2.764
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4397DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – Lamma village sewerage phase 2, package 1",
        "Actual Expenditure (HK$ million)":1.815
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":40.954
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":133.621
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4404DS",
        "Project Title":"Tuen Mun sewerage – Castle Peak Road trunk sewer and Tuen Mun village sewerage",
        "Actual Expenditure (HK$ million)":25.119
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":24.762
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4409DS",
        "Project Title":"North East New Territories sewerage system upgrade",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4410DS",
        "Project Title":"Trunk sewers at Hiram’s Highway",
        "Actual Expenditure (HK$ million)":4.853
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":204.178
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":13.694
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":261.405
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4417DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yuen Long",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":40.621
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4419DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Tai Po Kau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4420DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yau Tong",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":9.274
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":2.3
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":342.141
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":33.719
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":25.397
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":15.405
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":19.373
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4434DS",
        "Project Title":"Village Sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":0.313
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":6.539
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":16.961
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":2.117
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":85.075
    },
    {
        "Financial Year":"2020-21",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":5.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4064CD",
        "Project Title":"Rural Drainage Rehabilitation Scheme – drainage rehabilitation works at Sha Po Tsuen Stream",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":192.011
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4115CD",
        "Project Title":"Drainage improvement in Sha Tin and Tai Po – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":9.007
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4129CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4130CD",
        "Project Title":"Drainage improvement in Northern New Territories – package C – consultants' fees and investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4140CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Po Kong Village Road to Tung Kwong Road – remaining works",
        "Actual Expenditure (HK$ million)":9.024
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4152CD",
        "Project Title":"Drainage improvement works in upper Lam Tsuen River, She Shan River, upper Tai Po River, Ping Long and Kwun Hang",
        "Actual Expenditure (HK$ million)":0.041
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":35.233
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":160.955
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4172CD",
        "Project Title":"Rehabilitation of underground stormwater drains – remaining works",
        "Actual Expenditure (HK$ million)":22.987
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":35.97
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":16.258
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":50.54
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":30.022
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4401DS",
        "Project Title":"Feasibility study on relocation of Sham Tseng sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.024
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.024
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":11.864
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":354.096
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4445DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – main caverns construction and upstream sewerage works",
        "Actual Expenditure (HK$ million)":102.495
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4143DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 2 phase 2B works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":31.421
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":6.016
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":7.985
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":5.051
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4238DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – environmental impact assessment, investigations, tunnel conveyance system design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan Sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon Sewerage Improvements and Pollution Control, Stage II – Consultants' Fees and Investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4329DS",
        "Project Title":"Upgrading of Pillar Point sewage treatment works",
        "Actual Expenditure (HK$ million)":2.461
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4332DS",
        "Project Title":"Lam Tsuen Valley sewerage, stage 2",
        "Actual Expenditure (HK$ million)":0.04
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4340DS",
        "Project Title":"Port Shelter sewerage stage 3 – Mang Kung Uk sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":19.331
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":100.406
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4348DS",
        "Project Title":"North District and Tolo Harbour sewerage, sewage treatment and disposal - regional sewerage works, part 1 – sewerage upgrade",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.327
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4353DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – extension of sewerage system to other unsewered villages in Mui Wo",
        "Actual Expenditure (HK$ million)":7.895
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4355DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Lamma village sewerage phase 2, package 2",
        "Actual Expenditure (HK$ million)":9.488
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong Village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":23.361
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4364DS",
        "Project Title":"Lam Tsuen Valley sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":7.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.118
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":97.086
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":4.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4374DS",
        "Project Title":"Tuen Mun sewerage, stage 1 – village sewerage in Tsing Chuen Wai and Tuen Tsz Wai (part)",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":0.468
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":85.297
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":79.599
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":0.096
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":0.891
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.075
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":24.085
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":751.676
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":127.792
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":147.572
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":269.44
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":83.136
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":104.969
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":1.33
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4396DS",
        "Project Title":"Sewerage in Nam Wa Po and Wai Tau Tsuen",
        "Actual Expenditure (HK$ million)":0.176
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4397DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – Lamma village sewerage phase 2, package 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":48.912
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":128.089
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4404DS",
        "Project Title":"Tuen Mun sewerage – Castle Peak Road trunk sewer and Tuen Mun village sewerage",
        "Actual Expenditure (HK$ million)":23.046
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":26.23
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4409DS",
        "Project Title":"North East New Territories sewerage system upgrade",
        "Actual Expenditure (HK$ million)":20.947
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4410DS",
        "Project Title":"Trunk sewers at Hiram’s Highway",
        "Actual Expenditure (HK$ million)":14.798
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":187.028
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":11.426
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":107.066
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4417DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yuen Long",
        "Actual Expenditure (HK$ million)":16.939
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":33.499
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4419DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Tai Po Kau",
        "Actual Expenditure (HK$ million)":6.754
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4420DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yau Tong",
        "Actual Expenditure (HK$ million)":11.901
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":6.583
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":9.355
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":46.199
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":30.661
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":49.669
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":69.449
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":76.661
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4434DS",
        "Project Title":"Village sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":11.035
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":34.803
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":165.567
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":14.0
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":503.456
    },
    {
        "Financial Year":"2021-22",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":16.87
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4064CD",
        "Project Title":"Rural Drainage Rehabilitation Scheme – drainage rehabilitation works at Sha Po Tsuen Stream",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":80.3
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":15.1
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4140CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Po Kong Village Road to Tung Kwong Road – remaining works",
        "Actual Expenditure (HK$ million)":0.981
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4152CD",
        "Project Title":"Drainage improvement works in upper Lam Tsuen River, She Shan River, upper Tai Po River, Ping Long and Kwun Hang",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4161CD",
        "Project Title":"Improvement of Yuen Long Town Nullah (town centre section)",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":31.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":240.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4172CD",
        "Project Title":"Rehabilitation of underground stormwater drains – remaining works",
        "Actual Expenditure (HK$ million)":69.999
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4175CD",
        "Project Title":"Drainage improvement works in Tsim Sha Tsui",
        "Actual Expenditure (HK$ million)":60.347
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4178CD",
        "Project Title":"Yuen Long Barrage Scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":25.939
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":21.08
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":77.223
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":77.374
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4190CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2B",
        "Actual Expenditure (HK$ million)":6.267
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4191CD",
        "Project Title":"Drainage improvement works at Yuen Long – stage 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4192CD",
        "Project Title":"Drainage improvement works in Kwun Tong – phase 1",
        "Actual Expenditure (HK$ million)":20.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4401DS",
        "Project Title":"Feasibility study on relocation of Sham Tseng sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":6.01
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":141.02
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4445DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – main caverns construction and upstream sewerage works",
        "Actual Expenditure (HK$ million)":630.011
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":54.237
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":9.26
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":6.23
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":2.44
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan Sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon Sewerage Improvements and Pollution Control, Stage II – Consultants' Fees and Investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4329DS",
        "Project Title":"Upgrading of Pillar Point sewage treatment works",
        "Actual Expenditure (HK$ million)":0.488
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":21.65
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":78.336
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.15
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4353DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – extension of sewerage system to other unsewered villages in Mui Wo",
        "Actual Expenditure (HK$ million)":20.628
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4355DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Lamma village sewerage phase 2, package 2",
        "Actual Expenditure (HK$ million)":35.259
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4358DS",
        "Project Title":"Sewerage to Lo Wai, Chuen Lung and Kau Wa Keng Old Village",
        "Actual Expenditure (HK$ million)":3.828
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong Village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":33.816
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4364DS",
        "Project Title":"Lam Tsuen Valley sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":5.743
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":10.728
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.14
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":44.706
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":2.4
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":2.027
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":10.919
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":1.4
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":48.22
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":62.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":0.2
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":1.493
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":0.418
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":780.161
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":266.789
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":111.5
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":302.279
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":53.178
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":36.029
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":3.41
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4396DS",
        "Project Title":"Sewerage in Nam Wa Po and Wai Tau Tsuen",
        "Actual Expenditure (HK$ million)":2.018
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":44.958
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":147.892
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4404DS",
        "Project Title":"Tuen Mun sewerage – Castle Peak Road trunk sewer and Tuen Mun village sewerage",
        "Actual Expenditure (HK$ million)":40.587
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":2.5
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4409DS",
        "Project Title":"North East New Territories sewerage system upgrade",
        "Actual Expenditure (HK$ million)":90.646
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4410DS",
        "Project Title":"Trunk sewers at Hiram’s Highway",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":89.886
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":0.156
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":133.456
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4417DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yuen Long",
        "Actual Expenditure (HK$ million)":81.48
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":11.5
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4419DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Tai Po Kau",
        "Actual Expenditure (HK$ million)":23.213
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4420DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yau Tong",
        "Actual Expenditure (HK$ million)":74.666
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":13.049
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":9.121
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":32.799
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":35.785
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":112.407
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":143.169
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":194.725
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4434DS",
        "Project Title":"Village sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":15.533
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":97.69
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":224.97
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":13.556
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":719.997
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":27.0
    },
    {
        "Financial Year":"2022-23",
        "PWP Item No.":"4457DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage in Muk Wu, New Territories",
        "Actual Expenditure (HK$ million)":3.252
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4064CD",
        "Project Title":"Rural Drainage Rehabilitation Scheme – drainage rehabilitation works at Sha Po Tsuen Stream",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":44.945
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":5.5
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4140CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Po Kong Village Road to Tung Kwong Road – remaining works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4152CD",
        "Project Title":"Drainage improvement works in upper Lam Tsuen River, She Shan River, upper Tai Po River, Ping Long and Kwun Hang",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4161CD",
        "Project Title":"Improvement of Yuen Long Town Nullah (town centre section)",
        "Actual Expenditure (HK$ million)":31.22
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":21.71
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":212.153
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4172CD",
        "Project Title":"Rehabilitation of underground stormwater drains – remaining works",
        "Actual Expenditure (HK$ million)":104.985
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4175CD",
        "Project Title":"Drainage improvement works in Tsim Sha Tsui",
        "Actual Expenditure (HK$ million)":131.846
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4178CD",
        "Project Title":"Yuen Long Barrage Scheme",
        "Actual Expenditure (HK$ million)":157.916
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":7.468
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":21.95
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":22.116
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":79.138
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4190CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2B",
        "Actual Expenditure (HK$ million)":26.814
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4191CD",
        "Project Title":"Drainage improvement works at Yuen Long – stage 2",
        "Actual Expenditure (HK$ million)":40.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4192CD",
        "Project Title":"Drainage improvement works in Kwun Tong – phase 1",
        "Actual Expenditure (HK$ million)":92.295
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4196CD",
        "Project Title":"Drainage improvement works at North District – phase 1",
        "Actual Expenditure (HK$ million)":20.482
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4401DS",
        "Project Title":"Feasibility study on relocation of Sham Tseng sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":7.282
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":22.042
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4445DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – main caverns construction and upstream sewerage works",
        "Actual Expenditure (HK$ million)":1080.623
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4460DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – buildings, cavern ventilation system and associated works",
        "Actual Expenditure (HK$ million)":33.975
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":59.16
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":10.718
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":1.738
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":8.351
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan Sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon Sewerage Improvements and Pollution Control, Stage II – Consultants' Fees and Investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4329DS",
        "Project Title":"Upgrading of Pillar Point sewage treatment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.131
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":86.933
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4353DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – extension of sewerage system to other unsewered villages in Mui Wo",
        "Actual Expenditure (HK$ million)":30.985
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4355DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Lamma village sewerage phase 2, package 2",
        "Actual Expenditure (HK$ million)":55.937
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4358DS",
        "Project Title":"Sewerage to Lo Wai, Chuen Lung and Kau Wa Keng Old Village",
        "Actual Expenditure (HK$ million)":33.994
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong Village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":36.192
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":8.021
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.56
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":24.96
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":1.8
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":5.8
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":0.713
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":0.4
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":46.976
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":87.013
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":6.201
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":2.994
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":10.408
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":750.611
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":297.389
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":49.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":156.681
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":10.625
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":4.133
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":0.164
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4396DS",
        "Project Title":"Sewerage in Nam Wa Po and Wai Tau Tsuen",
        "Actual Expenditure (HK$ million)":0.007
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":35.106
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":126.94
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4404DS",
        "Project Title":"Tuen Mun sewerage – Castle Peak Road trunk sewer and Tuen Mun village sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":1.11
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4409DS",
        "Project Title":"North East New Territories sewerage system upgrade",
        "Actual Expenditure (HK$ million)":99.995
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":60.298
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":0.013
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":60.22
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4414DS",
        "Project Title":"Rehabilitation of underground sewers – remaining works",
        "Actual Expenditure (HK$ million)":10.577
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4417DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yuen Long",
        "Actual Expenditure (HK$ million)":129.958
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":0.773
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4419DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Tai Po Kau",
        "Actual Expenditure (HK$ million)":52.0
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4420DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yau Tong",
        "Actual Expenditure (HK$ million)":87.958
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4421DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Cheung Sha Wan",
        "Actual Expenditure (HK$ million)":46.642
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":11.2
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":1.588
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":7.733
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":45.838
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":103.498
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":124.057
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":184.698
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4434DS",
        "Project Title":"Village sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":24.854
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":127.866
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":244.999
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":8.858
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":815.601
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":35.802
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4457DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage in Muk Wu, New Territories",
        "Actual Expenditure (HK$ million)":21.308
    },
    {
        "Financial Year":"2023-24",
        "PWP Item No.":"4462DS",
        "Project Title":"North District sewerage, stage 1 phase 2C and stage 2 phase 1 – village sewerage in Sheung Shui Heung",
        "Actual Expenditure (HK$ million)":7.853
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":5.624
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":0.104
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4161CD",
        "Project Title":"Improvement of Yuen Long Town Nullah (town centre section)",
        "Actual Expenditure (HK$ million)":143.934
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":5.2
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":320.933
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4172CD",
        "Project Title":"Rehabilitation of underground stormwater drains – remaining works",
        "Actual Expenditure (HK$ million)":113.858
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4175CD",
        "Project Title":"Drainage improvement works in Tsim Sha Tsui",
        "Actual Expenditure (HK$ million)":235.216
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4176CD",
        "Project Title":"Drainage improvement works in Wong Tai Sin",
        "Actual Expenditure (HK$ million)":67.5
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4178CD",
        "Project Title":"Yuen Long Barrage Scheme",
        "Actual Expenditure (HK$ million)":535.815
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4179CD",
        "Project Title":"Drainage improvement works in Kowloon City",
        "Actual Expenditure (HK$ million)":59.594
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":0.722
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":24.446
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":10.493
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":43.802
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4190CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2B",
        "Actual Expenditure (HK$ million)":53.512
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4191CD",
        "Project Title":"Drainage improvement works at Yuen Long – stage 2",
        "Actual Expenditure (HK$ million)":145.564
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4192CD",
        "Project Title":"Drainage improvement works in Kwun Tong – phase 1",
        "Actual Expenditure (HK$ million)":192.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4196CD",
        "Project Title":"Drainage improvement works at North District – phase 1",
        "Actual Expenditure (HK$ million)":82.899
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4197CD",
        "Project Title":"Drainage improvement works in Mong Kok – phase 1",
        "Actual Expenditure (HK$ million)":60.152
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4198CD",
        "Project Title":"Drainage improvement works in Kwun Tong – phase 2",
        "Actual Expenditure (HK$ million)":42.797
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4199CD",
        "Project Title":"Drainage improvement works in Eastern District – phase 1",
        "Actual Expenditure (HK$ million)":11.19
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4200CD",
        "Project Title":"Drainage improvement works in Sha Tin and Sai Kung – phase 1",
        "Actual Expenditure (HK$ million)":16.8
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4201CD",
        "Project Title":"Drainage improvement works in Tai Po – phase 1",
        "Actual Expenditure (HK$ million)":25.999
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4402DS",
        "Project Title":"Feasibility study on relocation of Sai Kung sewage treatment works to caverns",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":8.447
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4445DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – main caverns construction and upstream sewerage works",
        "Actual Expenditure (HK$ million)":1327.352
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4460DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – buildings, cavern ventilation system and associated works",
        "Actual Expenditure (HK$ million)":192.788
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":42.162
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":12.089
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":4.044
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan Sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon Sewerage Improvements and Pollution Control, Stage II – Consultants' Fees and Investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":56.983
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4353DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – extension of sewerage system to other unsewered villages in Mui Wo",
        "Actual Expenditure (HK$ million)":35.3
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4355DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Lamma village sewerage phase 2, package 2",
        "Actual Expenditure (HK$ million)":62.816
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4358DS",
        "Project Title":"Sewerage to Lo Wai, Chuen Lung and Kau Wa Keng Old Village",
        "Actual Expenditure (HK$ million)":57.181
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong Village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":14.054
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":2.305
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":0.017
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":3.2
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":0.1
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":12.569
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":149.997
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":0.001
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":0.27
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4387DS",
        "Project Title":"Upgrading of Mui Wo sewage treatment works and sewerage at Mui Wo town centre and Wang Tong",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":419.531
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":267.599
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":44.073
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":127.999
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4393DS",
        "Project Title":"Rehabilitation of trunk sewers in Kowloon, Sha Tin and Sai Kung",
        "Actual Expenditure (HK$ million)":4.87
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":3.583
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":0.299
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":6.257
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":35.953
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":7.245
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4409DS",
        "Project Title":"North East New Territories sewerage system upgrade",
        "Actual Expenditure (HK$ million)":137.991
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":0.451
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":0.011
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":49.217
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4414DS",
        "Project Title":"Rehabilitation of underground sewers – remaining works",
        "Actual Expenditure (HK$ million)":42.614
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4417DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yuen Long",
        "Actual Expenditure (HK$ million)":149.926
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4419DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Tai Po Kau",
        "Actual Expenditure (HK$ million)":13.0
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4420DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yau Tong",
        "Actual Expenditure (HK$ million)":81.297
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4421DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Cheung Sha Wan",
        "Actual Expenditure (HK$ million)":109.998
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":4.168
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":0.13
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":0.323
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4427DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Southern District",
        "Actual Expenditure (HK$ million)":12.6
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":37.775
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":66.669
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":86.357
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":164.946
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4434DS",
        "Project Title":"Village sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":39.017
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":33.81
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":378.794
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":8.418
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":1033.407
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":20.27
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4457DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage in Muk Wu, New Territories",
        "Actual Expenditure (HK$ million)":39.123
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4461DS",
        "Project Title":"Port Shelter sewerage, stage 2 – trunk sewers between Marina Cove and Hong Kin Road",
        "Actual Expenditure (HK$ million)":0.7
    },
    {
        "Financial Year":"2024-25",
        "PWP Item No.":"4462DS",
        "Project Title":"North District sewerage, stage 1 phase 2C and stage 2 phase 1 – village sewerage in Sheung Shui Heung",
        "Actual Expenditure (HK$ million)":46.334
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4054BL",
        "Project Title":"Investigation of sewers and drains affecting the safety of cut slopes",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4103CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – Hong Kong West drainage tunnel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4104CD",
        "Project Title":"Drainage improvement in Northern Hong Kong Island – western lower catchment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4108CD",
        "Project Title":"West Kowloon drainage improvement – inter-reservoirs transfer scheme",
        "Actual Expenditure (HK$ million)":0.191
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4118CD",
        "Project Title":"Drainage improvement in Northern New Territories – package B (remaining works)",
        "Actual Expenditure (HK$ million)":2.999
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4128CD",
        "Project Title":"Drainage improvement in Southern Lantau",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4150CD",
        "Project Title":"Inter-Reservoirs Transfer Scheme – environmental impact assessment, investigation and design",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4160CD",
        "Project Title":"Happy Valley underground stormwater storage scheme",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4161CD",
        "Project Title":"Improvement of Yuen Long Town Nullah (town centre section)",
        "Actual Expenditure (HK$ million)":152.68
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4163CD",
        "Project Title":"Drainage improvement works at Ngong Ping",
        "Actual Expenditure (HK$ million)":13.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4169CD",
        "Project Title":"Reconstruction and rehabilitation of Kai Tak Nullah from Tung Kwong Road to Prince Edward Road East – main works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4171CD",
        "Project Title":"Revitalization of Tsui Ping River",
        "Actual Expenditure (HK$ million)":130.8
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4172CD",
        "Project Title":"Rehabilitation of underground stormwater drains – remaining works",
        "Actual Expenditure (HK$ million)":99.172
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4175CD",
        "Project Title":"Drainage improvement works in Tsim Sha Tsui",
        "Actual Expenditure (HK$ million)":275.196
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4176CD",
        "Project Title":"Drainage improvement works in Wong Tai Sin",
        "Actual Expenditure (HK$ million)":225.13
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4178CD",
        "Project Title":"Yuen Long Barrage Scheme",
        "Actual Expenditure (HK$ million)":689.539
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4179CD",
        "Project Title":"Drainage improvement works in Kowloon City",
        "Actual Expenditure (HK$ million)":204.251
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4180CD",
        "Project Title":"Rehabilitation of underground stormwater drains stage 1",
        "Actual Expenditure (HK$ million)":1.787
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4184CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2A",
        "Actual Expenditure (HK$ million)":12.4
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4185CD",
        "Project Title":"Drainage improvement works at Yuen Long, stage 1",
        "Actual Expenditure (HK$ million)":1.23
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4186CD",
        "Project Title":"Rehabilitation of underground stormwater drains – stage 2",
        "Actual Expenditure (HK$ million)":43.388
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4190CD",
        "Project Title":"Drainage improvement in Southern Hong Kong Island – package 2B",
        "Actual Expenditure (HK$ million)":60.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4191CD",
        "Project Title":"Drainage improvement works at Yuen Long – stage 2",
        "Actual Expenditure (HK$ million)":203.782
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4192CD",
        "Project Title":"Drainage improvement works in Kwun Tong – phase 1",
        "Actual Expenditure (HK$ million)":190.025
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4196CD",
        "Project Title":"Drainage improvement works at North District – phase 1",
        "Actual Expenditure (HK$ million)":238.06
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4197CD",
        "Project Title":"Drainage improvement works in Mong Kok – phase 1",
        "Actual Expenditure (HK$ million)":158.3
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4198CD",
        "Project Title":"Drainage improvement works in Kwun Tong – phase 2",
        "Actual Expenditure (HK$ million)":188.577
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4199CD",
        "Project Title":"Drainage improvement works in Eastern District – phase 1",
        "Actual Expenditure (HK$ million)":61.588
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4200CD",
        "Project Title":"Drainage improvement works in Sha Tin and Sai Kung – phase 1",
        "Actual Expenditure (HK$ million)":95.493
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4201CD",
        "Project Title":"Drainage improvement works in Tai Po – phase 1",
        "Actual Expenditure (HK$ million)":156.575
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4399DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – remaining works",
        "Actual Expenditure (HK$ million)":141.744
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4407DS",
        "Project Title":"Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":19.724
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4425DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – site preparation and access tunnel construction",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4445DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – main caverns construction and upstream sewerage works",
        "Actual Expenditure (HK$ million)":774.057
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4460DS",
        "Project Title":"Relocation of Sha Tin Sewage Treatment Works to caverns – buildings, cavern ventilation system and associated works",
        "Actual Expenditure (HK$ million)":502.693
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4061DR",
        "Project Title":"Northeast New Territories village sewerage, phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4196DS",
        "Project Title":"Tuen Mun sewerage, stage 1 phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4214DS",
        "Project Title":"Tseung Kwan O sewerage for villages",
        "Actual Expenditure (HK$ million)":12.581
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4222DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 1",
        "Actual Expenditure (HK$ million)":7.813
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4224DS",
        "Project Title":"Outlying Islands sewerage stage 1 phase 1C – upgrading of Siu Ho Wan sewage treatment plant",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4236DS",
        "Project Title":"Tai Po sewage treatment works, stage 5 phase 2B",
        "Actual Expenditure (HK$ million)":3.72
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4282DS",
        "Project Title":"Central, Western and Wan Chai West sewerage, stage 1 works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4301DS",
        "Project Title":"East Kowloon Sewerage, Stage II",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4302DS",
        "Project Title":"Chai Wan and Shau Kei Wan Sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4303DS",
        "Project Title":"East Kowloon Sewerage Improvements and Pollution Control, Stage II – Consultants' Fees and Investigations",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4314DS",
        "Project Title":"East Kowloon Sewerage: Stage I Phase II – Rehabilitation of Kwun Tong Road Sewers",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4341DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – upgrading of Stonecutters Island sewage treatment works and preliminary treatment works",
        "Actual Expenditure (HK$ million)":8.821
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4344DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 3",
        "Actual Expenditure (HK$ million)":13.244
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4351DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – planning and design of the upgrading works of Stonecutters Island sewage treatment works and the preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4353DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – extension of sewerage system to other unsewered villages in Mui Wo",
        "Actual Expenditure (HK$ million)":24.307
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4355DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Lamma village sewerage phase 2, package 2",
        "Actual Expenditure (HK$ million)":95.138
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4358DS",
        "Project Title":"Sewerage to Lo Wai, Chuen Lung and Kau Wa Keng Old Village",
        "Actual Expenditure (HK$ million)":43.373
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4362DS",
        "Project Title":"Sewerage for Ma Yau Tong Village, Tseung Kwan O",
        "Actual Expenditure (HK$ million)":5.306
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4366DS",
        "Project Title":"Kau Lung Hang sewerage – trunk sewers, pumping station and rising mains",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4367DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4368DS",
        "Project Title":"Yuen Long South sewerage and expansion of Ha Tsuen sewage pumping station",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4369DS",
        "Project Title":"Harbour Area Treatment Scheme, stage 2A – construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island sewage treatment works",
        "Actual Expenditure (HK$ million)":2.128
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4372DS",
        "Project Title":"Rehabilitation and construction of trunk sewers underneath Shing Mun River Channel",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4375DS",
        "Project Title":"Sewerage in Ping Kong, Fu Tei Pai and Tai Wo",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4377DS",
        "Project Title":"Upgrading of Central and East Kowloon sewerage – phase 2",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4378DS",
        "Project Title":"North District sewerage, stage 2 part 2A – Pak Hok Lam trunk sewer and Sha Tau Kok village sewerage",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4380DS",
        "Project Title":"Construction of dry weather flow interceptor at Cherry Street box culvert",
        "Actual Expenditure (HK$ million)":22.776
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4381DS",
        "Project Title":"Construction of additional sewage rising main and rehabilitation of the existing sewage rising main between Tung Chung and Siu Ho Wan",
        "Actual Expenditure (HK$ million)":139.969
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4382DS",
        "Project Title":"Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and west of Sai Kung town",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4385DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – South Lantau sewerage works – consultants’ detailed design fees",
        "Actual Expenditure (HK$ million)":0.055
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4386DS",
        "Project Title":"Village sewerage in Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang, and southern trunk sewer between Wai Tau Tsuen and Nam Wa Po",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4388DS",
        "Project Title":"Shek Wu Hui Effluent Polishing Plant",
        "Actual Expenditure (HK$ million)":79.462
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4389DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – phase 2",
        "Actual Expenditure (HK$ million)":349.433
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4390DS",
        "Project Title":"Rehabilitation of trunk sewers in Tuen Mun",
        "Actual Expenditure (HK$ million)":0.604
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4392DS",
        "Project Title":"Expansion of Sha Tau Kok Sewage Treatment Works – phase 1",
        "Actual Expenditure (HK$ million)":111.94
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4394DS",
        "Project Title":"Upgrading of Kwun Tong preliminary treatment works",
        "Actual Expenditure (HK$ million)":0.623
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4395DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 phase 1",
        "Actual Expenditure (HK$ million)":0.311
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4398DS",
        "Project Title":"Sewerage to Lei Yue Mun Village",
        "Actual Expenditure (HK$ million)":0.402
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4403DS",
        "Project Title":"Upgrading of sewage pumping stations and sewerage along Ting Kok Road",
        "Actual Expenditure (HK$ million)":8.816
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4406DS",
        "Project Title":"Shek Wu Hui sewage treatment works – further expansion phase 1A – advance works, consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":4.755
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4409DS",
        "Project Title":"North East New Territories sewerage system upgrade",
        "Actual Expenditure (HK$ million)":148.499
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4411DS",
        "Project Title":"Upgrading of San Wai sewage treatment works – phase 1",
        "Actual Expenditure (HK$ million)":0.54
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4412DS",
        "Project Title":"Yuen Long effluent polishing plant – consultants’ fees and investigation",
        "Actual Expenditure (HK$ million)":0.006
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4413DS",
        "Project Title":"Enhancement works for Kwun Tong sewage pumping station",
        "Actual Expenditure (HK$ million)":18.948
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4414DS",
        "Project Title":"Rehabilitation of underground sewers – remaining works",
        "Actual Expenditure (HK$ million)":62.613
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4417DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yuen Long",
        "Actual Expenditure (HK$ million)":135.876
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4418DS",
        "Project Title":"Upgrading of West Kowloon and Tsuen Wan sewerage – Phase 1",
        "Actual Expenditure (HK$ million)":0.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4419DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Tai Po Kau",
        "Actual Expenditure (HK$ million)":8.0
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4420DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Yau Tong",
        "Actual Expenditure (HK$ million)":163.991
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4421DS",
        "Project Title":"Construction and rehabilitation of trunk sewage rising mains in Cheung Sha Wan",
        "Actual Expenditure (HK$ million)":165.998
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4422DS",
        "Project Title":"Outlying Islands sewerage stage 2 – Peng Chau village sewerage phase 2 package 1",
        "Actual Expenditure (HK$ million)":0.924
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4423DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage for Tong To",
        "Actual Expenditure (HK$ million)":0.09
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4426DS",
        "Project Title":"Rehabilitation of underground sewers stage 1",
        "Actual Expenditure (HK$ million)":2.04
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4427DS",
        "Project Title":"Construction and rehabilitation of sewage rising mains in Southern District",
        "Actual Expenditure (HK$ million)":150.991
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4430DS",
        "Project Title":"Tolo Harbour sewerage of unsewered areas, stage 2 – phase 2",
        "Actual Expenditure (HK$ million)":8.576
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4431DS",
        "Project Title":"Port Shelter sewerage, stage 2, package 3",
        "Actual Expenditure (HK$ million)":46.915
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4432DS",
        "Project Title":"Port Shelter sewerage, stage 3, package 2",
        "Actual Expenditure (HK$ million)":68.755
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4433DS",
        "Project Title":"Construction of San Shek Wan Sewage Treatment Works and Pui O village sewerage",
        "Actual Expenditure (HK$ million)":253.935
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4434DS",
        "Project Title":"Village sewerage in Fanling Wai, So Kwun Po and Leng Pei Tsuen, Fanling",
        "Actual Expenditure (HK$ million)":33.09
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4435DS",
        "Project Title":"Village Sewerage in Northern Tuen Mun",
        "Actual Expenditure (HK$ million)":12.791
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4437DS",
        "Project Title":"Outlying Islands sewerage, stage 2 – upgrading of Cheung Chau sewage treatment and disposal facilities",
        "Actual Expenditure (HK$ million)":204.387
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4438DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 1",
        "Actual Expenditure (HK$ million)":1.025
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4439DS",
        "Project Title":"Yuen Long Effluent Polishing Plant – stage 1",
        "Actual Expenditure (HK$ million)":1170.57
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4440DS",
        "Project Title":"Rehabilitation of underground sewers – stage 2",
        "Actual Expenditure (HK$ million)":15.942
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4457DS",
        "Project Title":"North District sewerage stage 2 part 2A – village sewerage in Muk Wu, New Territories",
        "Actual Expenditure (HK$ million)":31.247
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4461DS",
        "Project Title":"Port Shelter sewerage, stage 2 – trunk sewers between Marina Cove and Hong Kin Road",
        "Actual Expenditure (HK$ million)":5.226
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4462DS",
        "Project Title":"North District sewerage, stage 1 phase 2C and stage 2 phase 1 – village sewerage in Sheung Shui Heung",
        "Actual Expenditure (HK$ million)":42.445
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4463DS",
        "Project Title":"Hung Shui Kiu Effluent Polishing Plant – Phase 1",
        "Actual Expenditure (HK$ million)":237.081
    },
    {
        "Financial Year":"2025-26",
        "PWP Item No.":"4465DS",
        "Project Title":"West Kowloon and Tsuen Wan village sewerage – phase 2 (package 1)",
        "Actual Expenditure (HK$ million)":14.5
    }
]