CCTV News Interviewed DSD about Flood Prevention Works

26 September 2016

CCTV News visited our Happy Valley Underground Stormwater Storage Tank and Lai Chi Kok Drainage Tunnel on 19 September 2016 for an interview. The interview covered DSD’s “Three-pronged flood prevention” strategies, namely local drainage improvement, flood interception and flood storage.

The interview was broadcast on 24 September 2016. Please refer to the following link for the interview:
http://english.cctv.com/2016/09/26/VIDEcDmWnkHg1d1a5KISBETt160926.shtml


Chief Engineer of Drainage Projects Division, Mr. KAN Hon-shing elaborated the design concepts and operation of the Happy Valley Underground Stormwater Storage Scheme
Chief Engineer of Drainage Projects Division, Mr. KAN Hon-shing elaborated the design concepts and operation of the Happy Valley Underground Stormwater Storage Scheme


Senior Engineer of Land Drainage Division, Mr. LEUNG Wah-ming, Richard illustrated DSD’s “Three-pronged flood prevention” strategies
Senior Engineer of Land Drainage Division, Mr. LEUNG Wah-ming, Richard illustrated DSD’s “Three-pronged flood prevention” strategies


Senior Engineer of Project Management Division, Mr. LEE Hong-nin, Robin introduced the structure and operation of Lai Chi Kok Drainage Tunnel
Senior Engineer of Project Management Division, Mr. LEE Hong-nin, Robin introduced the structure and operation of Lai Chi Kok Drainage Tunnel

 

 

 
 

Back to Top