DSD awarded Contract No. DC/2018/02 “Upgrading of Sewage Pumping Stations and Sewerage along Ting Kok Road”

7 March 2019

The Drainage Services Department (DSD) signed a works contract of about $267 million with Shanghai Construction Overseas Engineering Limited on 7 March 2019.The works include demolition and reconstruction of three sewage pumping stations at Ting Kok Road; construction of about 6.6 kilometre of sewage rising mains and gravity sewers along Ting Kok Road; and construction of about 1.7 kilometre of sewers and drainage pipes at Tai Po Tau, Ping Kong and Shuen Wan Lei Uk.  The 54-month works contract commenced on 28 February 2019.
 

The Assistant Director/Projects & Development of DSD, Mr WONG Sui-kan (second right) and the Director of Shanghai Construction Overseas Engineering Limited, Ms Iris YING (second left) attended the Contract Signing Ceremony
The Assistant Director/Projects & Development of DSD, Mr WONG Sui-kan (second right) and the Director of Shanghai Construction Overseas Engineering Limited, Ms Iris YING (second left) attended the Contract Signing Ceremony


 
 
 

Back to Top