DSD awarded Contract No. DC/2018/08 “Inter-reservoirs Transfer Scheme – Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir”

19 February 2019

The Drainage Services Department (DSD) signed a works contract of about $763 million contract with Bouygues Travaux Publics on 19 February 2019.  The works include construction of a water tunnel of about 2.8 kilometres with 3 metres diameter from the Kowloon Byewash Reservoir to the Lower Shing Mun Reservoir and the associated intake and outfall structures at both ends of the tunnel.  This 38-month works contract commences on 27 February 2019.


The Director of Drainage Services, Mr Edwin TONG Ka-hung (second right) and representative of Bouygues Travaux Publics, Mr Wesley Scott JONES (second left) attended the contract signing ceremony
The Director of Drainage Services, Mr Edwin TONG Ka-hung (second right) and representative of Bouygues Travaux Publics, Mr Wesley Scott JONES (second left) attended the contract signing ceremony



 

 

 

 
 

Back to Top