DSD awarded Contract No. DC/2018/03 “Expansion of Sha Tau Kok Sewage Treatment Works Phase I and Village Sewerage in Tong To”

21 November 2018

The Drainage Services Department signed a works contract of about $1,123 million with Build King – Kum Shing Joint Venture on 21 November 2018. The works include reconstruction of existing Sha Tau Kok Sewage Treatment Works for raising its sewage treatment capacity, construction of 1.7 km submarine outfall, and provision of village sewerage at Tong To. This 66-month works contract has commenced on the same date.


The Assistant Director / Projects and Development of DSD, Mr WONG Sui-kan (forth left), the Executive Director, Mr. LUI Yau-chun, Paul (third right) and Director, Mr. SO Yiu-wing, Wilfred (second right) of Build King Civil Engineering Limited and the Executive Director and Deputy CEO, Mr. WONG Siu-han (second left) attended the contract signing ceremony

The Assistant Director / Projects and Development of DSD, Mr WONG Sui-kan (forth left), the Executive Director, Mr. LUI Yau-chun, Paul (third right) and Director, Mr. SO Yiu-wing, Wilfred (second right) of Build King Civil Engineering Limited and the Executive Director and Deputy CEO, Mr. WONG Siu-han (second left) attended the contract signing ceremony


 
 
 

Back to Top