DSD awarded Contract No. DC/2023/11 “Construction and Rehabilitation of Sewage Rising Mains in Southern District”
20 January 2025
The Drainage Services Department (DSD) signed a works contract of about $879 million with KL-CW JV on 20 January 2025. The works include construction of about 8.8 kilometres (km) of sewage rising mains connecting the sewage pumping stations at Island Road to the sewerage system at Ap Lei Chau Bridge Road in Southern District; and construction of a boardwalk of about 450 metres in length along the northern bank of Staunton Creek Nullah in Wong Chuk Hang. This 53-month works contract commenced on 3 January 2025.
The Assistant Director/Sewage Services, Mr. Raymond LEE Wai-man (third right), the Chief Engineer/Consultants Management, Mr. LAI Ying-keung (third left) of DSD, the Director, Mr. CHAN Anthony Yin-chung (second right) of Kwan Lee Holding Limited, the Chairman, Mr. Stephen LEE Ka-lun (first right) of Chun Wo Construction Holdings Company Limited, and the Director, Mr. William LUK Wai-lam (second left) and the General Manager(Construction), Mr. DING Zhicheng (first left) of Chun Wo Construction and Engineering Company Limited attended the Contract Signing Ceremony.