Drainage Services Department

DSD awarded Contract No. DC/2023/08 “Construction of Trunk Sewage Rising Main in Cheung Sha Wan”

29 August 2023

The Drainage Services Department signed a works contract of $504 million with Chun Wo Construction and Engineering Company Limited on 29 August 2023. The works include construction of approximate 1.7 kilometres of single-pipe trunk sewage rising main between Cheung Sha Wan sewage pumping station and Northwest Kowloon preliminary treatment works.  The 48-month works contract commenced on 23 August 2023.

The Assistant Director / Sewage Services, Mr. LEE Wai Man (second right), the Chief Engineer / Consultants Management, Mr. LAI Ying Keung (first right) of DSD and the Director, Mr. LUK Wai Lam (second left) and Assistant General Manager (Construction), Mr. DING Zhicheng (first left), of Chun Wo Construction and Engineering Company Limited attended the Contract Signing Ceremony.

The Assistant Director / Sewage Services, Mr. LEE Wai Man (second right), the Chief Engineer / Consultants Management, Mr. LAI Ying Keung (first right) of DSD and the Director, Mr. LUK Wai Lam (second left) and Assistant General Manager (Construction), Mr. DING Zhicheng (first left), of Chun Wo Construction and Engineering Company Limited attended the Contract Signing Ceremony.

Back to Top