DSD awarded Contract No. DC/2022/01 “Drainage Improvement Works in Tsim Sha Tsui”
18 August 2022
The Drainage Services Department signed a works contract of about $734 million with CW-KL JV on 18 August 2022. The works include construction of a stormwater storage scheme comprising an underground storage tank of 18,000m3 and pumping station with 8m3/s at Urban Council Centenary Garden (UCCG); construction of approximate 1 km of stormwater drains of diameters ranging from 600mm to 1800mm at Chatham Road South, Kimberley Road, Observatory Road, Granville Road, Granville Square and Cameron Road; and ancillary works including reinstatement of the UCCG and associated facilities. This 46-month works contract commenced on 19 August 2022.
The Assistant Director / Projects and Development, Mr CHOI Wing-hing (third right), the Chief Engineer / Project Management, Mr POON Sui-shun (third left) of DSD, the Director, Mr LUK Wai-lam (second left) and Operations Manager, Mr DING Zhi-cheng (first left) of Chun Wo Construction and Engineering Company Limited and the Director, Mr CHAN Yin-chung (second right) and Director, Mr LEE La-lun (first right) of Kwan Lee Holding Limited attended the Contract Signing Ceremony.