Drainage Services Department

DSD awarded Agreement No. CE 24/2021 (EP) “Enhancement of Existing River Sections – Phase 1 - Investigation”

22 November 2021

The Drainage Services Department signed a consultancy agreement of approximately $5.8 million with Mott MacDonald Hong Kong Limited on 22 November 2021 for undertaking the investigation study of enhancement of existing river sections.

The scope of the consultancy agreement comprises preliminary design and technical assessments for enhancement of Lower Lam Tsuen River, Lam Tei River, Chung Hung Nullah and Wong Lung Hang Channel.  The consultancy agreement will last for about 18 months.

The Assistant Director/Operations and Maintenance of DSD, Mr CHOI Wing-hing (second left), the Managing Director, Dr Anne Frances Kerr (third right) and the Advisory Section Leader, Mr CHING Ming-kam (second right) of Mott MacDonald Hong Kong Limited attended the agreement signing ceremony

The Assistant Director/Operations and Maintenance, Mr CHOI Wing-hing (second left), Chief Engineer/Land Drainage, Mr LAU Shing-cheong (first left) of DSD, the Managing Director, Dr Anne Frances Kerr (third right) and the Advisory Section Leader, Mr CHING Ming-kam (second right) of Mott MacDonald Hong Kong Limited attended the agreement signing ceremony

Back to Top