Drainage Services Department

DSD awarded Agreement No. CE 72/2020 (DS) “Village Sewerage for Kam Tin, Yuen Long (Stage 1) – Investigation”

29 June 2021

The Drainage Services Department signed a consultancy agreement of about $3.96 million on 29 June 2021 with Arcadis Design & Engineering Limited for undertaking the investigation study for “Village Sewerage for Kam Tin, Yuen Long (Stage 1)”.

The consultancy agreement adopts New Engineering Contract 4 Professional Services Contract  Option A. The scope includes impact assessments and preliminary design for the proposed sewerage system for eight villages in Kam Tin, Yuen Long. The consultancy agreement will last for about 18 months.

The Assistant Director/Sewage Services, Mr LEUNG Wing-yuen, Walter (second right), Principal Project Coordinator/Special Duty, Mr CHOI Chun-ming (first right) of DSD and the Director, Mr LAU Kam-fan, Lewis (second left), Principal Engineer, Mr LAM Ho-tak (first left) of Arcadis Design & Engineering Limited attended the Agreement Signing Ceremony

The Assistant Director/Sewage Services, Mr LEUNG Wing-yuen, Walter (second right), Principal Project Coordinator/Special Duty, Mr CHOI Chun-ming (first right) of DSD and the Director, Mr LAU Kam-fan, Lewis (second left), Principal Engineer, Mr LAM Ho-tak (first left) of Arcadis Design & Engineering Limited attended the Agreement Signing Ceremony

Back to Top