DSD awarded Contract No. DC/2019/05 “Drainage Improvement Works at Yuen Long – Stage 1”
3 November 2020
The Drainage Services Department signed a works contract of about $123.21 million with Ming Shing Construction Engineering Company Limited on 3 November 2020. The works includes construction of drainage channels and stormwater drains at Tai Tseng Wai, Shui Tsiu San Tsuen, Ho Lik Pui and Shan Ha Tsuen. This 27-month works contract already commenced on 29 October 2020.
The Assistant Director / Projects and Development of DSD, Mr WONG Sui-kan (second right), and the Director of Ming Shing Construction Engineering Company Limited, Mr LAW Fu-keung (second left), attended the contract signing ceremony