DSD awarded Agreement No. CE 79/2019 (DS) “Construction of Dry Weather Flow Interceptor at Hung Hom and Causeway Bay – Investigation, Design and Construction”

11 June 2020

The Drainage Services Department signed an $11.2 million consultancy agreement on 11 June 2020 with Black & Veatch Hong Kong Limited for undertaking the investigation, design and construction for Construction of Dry Weather Flow Interceptor at Hung Hom and Causeway Bay.

The scope of the consultancy agreement comprises preliminary and detailed design, public consultation, preparation of tender documents, assessment of tender and construction supervision for the dry weather flow interceptor at Hung Hom and Causeway Bay.  The consultancy agreement will last for about 98 months.

 

The Assistant Director / Sewage Services of DSD, Mr Walter LEUNG Wing-yuen (second right) and the Managing Director of Black & Veatch Hong Kong Limited, Mr KWOK Yim (second left), attended the Agreement Signing Ceremony

 

The Assistant Director / Sewage Services of DSD, Mr Walter LEUNG Wing-yuen (second right) and the Managing Director of Black & Veatch Hong Kong Limited, Mr KWOK Yim (second left), attended the Agreement Signing Ceremony

Back to Top