DSD awarded Contract No. DC/2019/02 “Drainage Maintenance and Construction in Mainland South Districts (2019-2023)”

21 November 2019

The Drainage Services Department signed a maintenance term contract of about $205 million with Welcome Construction Company Limited – Riseway Construction Engineering Limited Joint Venture on 21 November 2019. The works include maintenance and minor improvement works for the drainage and sewerage systems in Mainland South districts. This 48-month works contract commenced on 25 November 2019.

 

The Assistant Director / Operations and Maintenance of DSD, Mr. HO Yiu Kwong, (fourth right), Chief Engineer/ Mainland South, Mr. CHAN Chi Ming, Saulomon (third right), the Chairman, Mr. CHAN Se Ping, Michael (fourth left) and the Directors, Mr. CHAN Yam Man, Adam (third left), Mr. WONG Chi Fai, Brian (second left) and Ms. LI Shu Chun, Jean (first left) attended the contract signing ceremony.

The Assistant Director / Operations and Maintenance of DSD, Mr. HO Yiu Kwong, (fourth right), Chief Engineer/ Mainland South, Mr. CHAN Chi Ming, Saulomon (third right), the Chairman, Mr. CHAN Se Ping, Michael (fourth left) and the Directors, Mr. CHAN Yam Man, Adam (third left), Mr. WONG Chi Fai, Brian (second left) and Ms. LI Shu Chun, Jean (first left) attended the contract signing ceremony.

Back to Top