DSD awarded Contract No. DE/2018/04 “Shek Wu Hui Effluent Polishing Plant – Main Works Stage 1 – E&M Works for Sewage Treatment Facilities”

12 December 2019

The Drainage Services Department signed a works contract of about $558 million with Bestwise Envirotech Limited on 12 December 2019.  The works include electrical and mechanical installation works for sewage treatment facilities including inlet works no. 1, primary sedimentation tanks, bioreactors and pre-treatment screen chamber, membrane tanks and building no. 2, etc.; and testing and commissioning for the associated systems. This 54-month works contract commenced on 2 December 2019.

 

The Director of Drainage Services, Mr. LO Kwok-wah, Kelvin (second right), Chief Engineer/ Sewerage Projects, Mr. YIP Tat-ming, Ben (first right), the Directors, Mr. LEE Yat-wah (second left) and Mr. SZETO Chi-wing (first left) of Bestwise Envirotech Limited attended the contract signing ceremony

The Director of Drainage Services, Mr. LO Kwok-wah, Kelvin (second right), Chief Engineer/ Sewerage Projects, Mr. YIP Tat-ming, Ben (first right), the Directors, Mr. LEE Yat-wah (second left) and Mr. SZETO Chi-wing (first left) of Bestwise Envirotech Limited attended the contract signing ceremony

Back to Top