Drainage Services Department

PWP No. 4447DS

Rehabilitation and construction of sewage rising mains (package 2) – Kowloon and Southern District

Project Scope

The scope of the project comprises –
(a)   construction of about 760 metres (m) of 300 millimetres (mm) diameter single-pipe discharge rising mains connecting Shek O preliminary treatment works (PTW) to Tai Tau Chau discharge chamber, and replacement and rehabilitation of about 980 m of existing 300 mm diameter single-pipe discharge rising mains;
(b)   construction of about 350 m of 250 mm diameter twin-pipe sewage rising mains connecting Ap Lei Chau West sewage pumping station (SPS) to Ap Lei Chau PTW;
(c)   construction of about 200 m of 300 mm diameter twin-pipe sewage rising mains connecting Stanley Main Street SPS to the sewerage system at Stanley Main Street;
(d)   construction of about 400 m of 600 mm diameter twin-pipe sewage rising mains connecting Whampoa Garden SPS to the sewerage system at Tai Wan Road East; 
(e)   construction of about 150 m of 500 mm diameter single-pipe sewage rising mains connecting San Po Kong SPS to the sewerage system at Prince Edward Road East, and rehabilitation of about 150 m of existing 500 mm diameter single-pipe sewage rising mains; and
(f)   ancillary works

Major Improvements and Benefits

The operational efficiency and reliability of the relevant sewage rising mains network will be enhanced significantly when all works are completed

Consultants

CE 40/2020 (DS) - Binnies Hong Kong Limited
CE 41/2020 (DS) - Meinhardt Infrastructure and Environment Limited

Contractor

DC/2026/01 - Best Build Construction Company Limited
DC/2026/02 - Best Build Construction Company Limited

Contract No.
DC/2026/01, DC/2026/02
Project Commencement Date
17 July 2026
Project Completion Date
End 2029
Project estimate

About $348.0 million

Controlling Division
Consultants Management Division
Type
Sewerage and sewage treatment
District
Southern; Kowloon City; Wong Tai Sin
Status
On-going
Other Information
Back to Top