PWP No. 4421DS
Construction and rehabilitation of trunk sewage rising mains in Cheung Sha Wan
The scope of the project comprises –
(a) the construction of about 1.7 kilometres (km) of single-pipe trunk sewage rising main with diameters ranging from 1 800 millimetres (mm) to 2 000 mm connecting Cheung Sha Wan Sewage Pumping Station (CSWSPS) to Northwest Kowloon Preliminary Treatment Works (NWKPTW) on Stonecutters Island;
(b) the rehabilitation of about 1.6 km of existing twin-pipe trunk sewage rising mains with diameters ranging from 1 800 mm to 2 000 mm connecting CSWSPS to NWKPTW on Stonecutters Island; and
(c) ancillary works
(a) the construction of about 1.7 kilometres (km) of single-pipe trunk sewage rising main with diameters ranging from 1 800 millimetres (mm) to 2 000 mm connecting Cheung Sha Wan Sewage Pumping Station (CSWSPS) to Northwest Kowloon Preliminary Treatment Works (NWKPTW) on Stonecutters Island;
(b) the rehabilitation of about 1.6 km of existing twin-pipe trunk sewage rising mains with diameters ranging from 1 800 mm to 2 000 mm connecting CSWSPS to NWKPTW on Stonecutters Island; and
(c) ancillary works
To reduce the risks of bursting of the trunk sewage rising mains, improve the stability of the overall sewage system and reduce the difficulty of maintenance in the future
Binnies Hong Kong Limited
Chun Wo Construction and Engineering Company Limited
DC/2023/08
23 August 2023
End 2030
About $1,199.8 million
Consultants Management Division
Sewerage and sewage treatment
Sham Shui Po
On-going