PWP No. 4192CD

Drainage improvement works in Kwun Tong – phase 1

Project Scope

The scope of the project comprises (a) Construction of an underground stormwater storage tank at the Sau Nga Road Playground in Kwun Tong with a capacity of about 64,000 cubic metres and the associated electrical and mechanical facilities; (b) Construction of about 185 metres of stormwater drains in the nearby roads including Hip Wo Street; (c) Re-provision and enhancement of the Sau Nga Road Playground; and (d) Carrying out ancillary works

Major Improvements and Benefits

To improve the drainage capacity of the drainage system in Tsui Ping Road, Kai Lim Road, the nearby Kwun Tong Road and Tsui Ping River so as to alleviate the flooding risk in the areas mentioned above

Contractor

KL – CW JV (Kwan Lee Holding Limited – Chun Wo Construction and Engineering Company Limited Joint Venture)

Contract No.
DC/2022/05
Project Commencement Date
26 September 2022
Project Completion Date
Early 2028
Project estimate

About $938.3 million

Controlling Division
Drainage Projects Division
Type
Flood Prevention
District
Kwun Tong
Status
On-going