PWP No. 4185CD
Drainage improvement works at Yuen Long, stage 1
Construction of drainage channels and stormwater drains at Tai Tseng Wai, Shui Tsiu San Tsuen, Ho Lik Pui and Shan Ha Tsuen
Reduction of the flood risk by bringing the drainage system up to the current flood protection standard
Atkins China Limited
Ming Shing Construction Engineering Co. Ltd.
DC/2019/05
29 October 2020
16 March 2023
About $256.2 million
Project Management Division
Flood Prevention
Yuen Long
Completed