PWP No. 4176CD

Drainage improvement works in Wong Tai Sin

Project Scope

The scope of the project comprises –
(a)   construction of an underground stormwater storage tank with a capacity of about 47 000 cubic metres and the associated above ground structure at Morse Park in Wong Tai Sin;
(b)   re-provision and enhancement of part of Morse Park;
(c)   construction of stormwater drains of about 1.4 kilometres long with diameters ranging from 1.2 metres (m) to 2.5 m at Wing Chuk Street, Chuk Yuen Road, Ma Chai Hang Road, Fung Mo Street, Wong Tai Sin Road and Po Kong Village Road in Wong Tai Sin;
(d)   rehabilitation of stormwater drains of about 560 m long at Po Kong Village Road in Wong Tai Sin; and
(e)   carrying out ancillary works

Major Improvements and Benefits

To upgrade the capacity of the drainage system concerned and alleviate the flood risks in the vicinity of Lung Cheung Road near Shatin Pass Road

Consultants

CE 41/2021 (DS) - WSP (Asia) Limited

Contractor

Build King – STEC Joint Venture (Build King Civil Engineering Limited – Shanghai Tunnel Engineering Co. Ltd. Joint Venture)

Contract No.
DC/2024/03
Project Commencement Date
6 August 2024
Project Completion Date
Mid 2029
Project estimate

About $1,539.4 million

Controlling Division
Project Management Division
Type
Flood Prevention
District
Wong Tai Sin
Status
On-going
Other Information