PWP No. 4174CD

Drainage Improvement Works in Mong Kok

Project Scope
The scope of project comprises construction of an underground stormwater storage scheme with a storage capacity of about 50 000 m3within Boundary Street Playground; extension of the existing Tai Hang Tung Stormwater Storage Scheme with an increase in storage capacity from 100 000 m3to 220 000 m3; and construction of about 1.2km drainage works along Embankment Road, Boundary Street; Nam Shan Chuen Road, Tai Hang Tung Road and Tai Hang Sai Street.
Major Improvements and Benefits
The project will relieve the flood risk in the Mong Kok area.
Consultants
Black & Veatch Hong Kong Limited (for investigation study)
Controlling Division
Drainage Projects Division
Type
Flood Prevention
District
Yau Tsim Mong
Status
Under planning & design