Improvement of Yuen Long Town Nullah (town centre section)
The scope of the project comprises –
(a) construction of a dry weather flow (DWF) interception system including a pumping station with designed capacity of about 18 000 cubic metres per day, box culverts with DWF interceptors of about 3.6 kilometres (km), and construction of pipes of about 600 metres;
(b) strengthening the structure of a section of the Yuen Long Nullah (town centre section) of about 1 km;
(c) revitalisation of a section of the Yuen Long Nullah of about 1 km between the Long Ping Station and the Shap Pat Heung Road;
(d) carrying out ancillary works
To enhance the local environment of Yuen Long Town Nullah at the town centre section and its surroundings
Binnies Hong Kong Limited
China State – Alchmex Joint Venture (China State Construction Engineering (Hong Kong) Limited – Alchmex International Construction Limited Joint Venture)
About $857.0 million