PWP No. 4108CD
West Kowloon Drainage Improvement – Inter-reservoirs Transfer Scheme (IRTS)
Project Scope
Construction of a water tunnel of about 2.8 km in length and 3 m in diameter, from Kowloon Byewash Reservoir to Lower Shing Mun Reservoir and the associated intake and outfall structures at both ends of the tunnel
Major Improvements and Benefits
The IRTS serves dual purposes of improving flood protection level in West Kowloon areas and achieving water conservation by transferring collected surface runoff from the Kowloon group of reservoirs to the Lower Shing Mun Reservoir. It will also strengthen our resilience in flood mitigation for combating climate change.
Consultants
Black & Veatch Hong Kong Limited
Contractor
Bouygues Travaux Publics
Contract No.
DC/2018/08
Project Commencement Date
27 February 2019
Project Completion Date
End 2022
Project estimate
$1,222 million
Controlling Division
Drainage Projects Division
Type
Flood Prevention
District
Sha Tin
Status
On-going