Drainage Services Department

Disclosure Log 

The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information (“the Code”) by this department.  The disclosure log will be updated on a quarterly basis.

If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer.  Such requests will be handled in accordance with the Code.

 

January to March 2024

Reference number Information requested and released

1/24

Information related to a monitoring device set up near Fan Kam Road, Pat Heung

4/24

Information related to water level at Kai Tak River, Lam Tsuen River and Shing Mun River

6/24

Results of the odour measurement and the layout plan for the sampling points at To Kwa Wan Preliminary Works on 12 October 2023

 

April to June 2024

Reference number Information requested and released

9/24

Information related to average monthly quantities of treated sewage sludge, treated food waste, and biogas produced

10/24

Information related to the requirements of sewage discharged to the public sewerage system

11/24

Record of number of reported flooding cases in September and October 2023

12/24

Information related to the design capacity and flow records of the pumping stations

13/24

Information related to the landscape plan of Ma On Shan Sewage Pumping Station

15/24

Information related to Flood Monitoring System

16/24

Research and development report on New Engineering Contract

 

July to September 2024

Reference number Information requested and released

17/24

Information related to Effluent Quality of Major Sewage Treatment Works in 2021 to 2023

18/24

Information related to Effluent Quality of Major Sewage Treatment Works in 2021 to 2023

21/24

Statistics of Survey Officer (Quantity) grade in the Drainage Services Department

23/24

1.      Information on disciplinary mechanism and statistics on disciplinary cases in Drainage Services Department

2.      Guidance on CCTV surveillance practices

3.      Arrangements on fee-paying electric vehicle charging services

24/24

Information relating to the number, costs and electricity generated of floating photovoltaic systems

25/24

Causes of flooding at Hip Wo Street on 27 July 2024

26/24

1.      Research & Development Full Reports

2.      Annual expenditure of sewer network monitoring and maintenance in Financial Year 2023 – 24

27/24

Number of complaints received about the hygiene conditions of Shing Mun River

29/24

Number of blocked drains complaints received from July 2022 to August 2024 at 42-46 Shanghai Street

32/24

District boundary of district offices

35/24

Flooding Reports on 9 September, 8 and 9 October 2023

36/24

Number of blocked drains complaints received from August to September 2024 at 42-46 Shanghai Street

37/24

Information related to the rain gauges managed by DSD

Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.

Back to Top