Disclosure Log
The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information (“the Code”) by this department. The disclosure log will be updated on a quarterly basis.
If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code.
January to March 2019
Reference number | Information requested and released |
---|---|
45/18 |
Information related to 13 completed projects |
2/19, 5/19 |
- Information on the Workman II recruitment exercises in 2015 and 2018 |
6/19 |
Design capacity of sewage pumps for Hang Tau Sewage Pumping Station and its actual flow |
9/19 |
Information related to the water level and bank level at the gauging stations of four rivers and the location of the gauging stations concerned in 2017 and 2018 |
10/19 |
A map on work coverage in Mui Wo of a contract |
11/19 |
Information related to rehabilitation works at Ng Tung River and Sheung Yue River |
April to June 2019
Reference number | Information requested and released |
---|---|
12/19 |
Information related to a project at Mui Wo |
14/19 |
Information related to the statistic of sewerage pipe leakage, burst and rehabilitation of Drainage Services Department in past 10 years |
16/19 |
Information related to the government vehicles of DSD |
17/19 |
Notes of a consultation meeting |
19/19 |
Expenditure paid by DSD to contractors for use of Quality Powered Mechanical Equipment (QPME) for each year from 2015 to 2017 |
20/19, 22/19 |
Information related to the major sewage treatment works |
21/19 |
Drawings on the as-built details of the location, site layout, pumping station, aerated lagoon and control building at Tseung Kwan O Preliminary Treatment Works. |
July to September 2019
Reference number | Information requested and released |
---|---|
27/19 |
- Effluent quality of major sewage treatment works |
31/19, 39/19 |
Information related to 5 projects |
33/19 |
The contract drawing of a works contract |
37/19 |
Information related to operation cost of sewage treatment and operation expenditure of respective sewage treatment works |
38/19 |
- Information related to major sewage treatment works and respective operation expenditure |
October to December 2019
Reference number | Information requested and released |
---|---|
40/19 |
Information related to the sedimentation and mangrove impacts at estuaries of tidal rivers |
43/19 |
Water level information at two gauging stations at Tin Shui Wai |
44/19 |
Water level information and locations of gauging stations at Tuen Mun Nullah and Kam Tin River |
45/19 |
Tide information at the Tai O Tide Station |
46/19 |
Information on the contract price and name of successful tenderer in respect of a minor works contract |
Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service.