Brand Hong Kong
GovHK Traditional Chinese Simplified Chinese Search Search Site Map Contact Us
Flood Prevention
Home
What's New
About Us
Our Projects
Flood Prevention
Our Achievement
Ecological Enhancement
Our Flooding Problems
How to reduce flood damage
Flooding Blackspots
Flood Prevention Strategy
Flood Protection Standards
Long Term Improvement Measures
On-going Improvement and Mitigation Measures
Preventive Maintenance
Land Use Management and Legislation
Short Movies on Flood Prevention
Sewerage
Sewage Services Charging Scheme
Publicity and Publications
Access to Information
Service Enquiries
FAQ
Tender Notices
Useful Links
Five - day week in Drainage Services Department
 
Flood Prevention
Flood Prevention > Long Term Improvement Measures
Drainage Master Planning  | Rural works  | Urban works  | Ecological Enhancement
Long Term Improvement Measures

Structural measures are one of the fundamental components of the flood prevention strategy. DSD is delivering capital drainage improvement works under the following categories, which are at different stages of planing, design, and construction.

 

 The completed rehabilitation works at Sheung Yue River, Sheung Shui

b_ball.gif (1008 bytes) Drainage Master Planning

b_ball.gif (1008 bytes) Rural works

         River training works

         Village flood protection schemes

b_ball.gif (1008 bytes) Urban works

         Drainage tunnels

         Flood storage ponds

b_ball.gif (1008 bytes) Major Projects

Upon completion of these extensive long-term structural measures, major flood problems within the territory will be resolved.

b_ball.gif (1008 bytes) Download and view the short movies on flood prevention works

Last revision date: 11 August 2008