Brand Hong Kong
GovHK Traditional Chinese Simplified Chinese Search Search Site Map Contact Us
Flood Prevention
Home
What's New
About Us
Our Projects
Flood Prevention
Our Achievement
Ecological Enhancement
Our Flooding Problems
How to reduce flood damage
Flooding Blackspots
Flood Prevention Strategy
Flood Protection Standards
Long Term Improvement Measures
On-going Improvement and Mitigation Measures
Preventive Maintenance
Land Use Management and Legislation
Short Movies on Flood Prevention
Sewerage
Sewage Services Charging Scheme
Publicity and Publications
Access to Information
Service Enquiries
FAQ
Tender Notices
Useful Links
Five - day week in Drainage Services Department
 
Flood Prevention
Flood Prevention > Land Use Management and Legislation > Land Use Management
Land Use Management  | Land Drainage Ordinance
Land Use Management

In the past, spontaneous development in the New Territories frequently occurred, usually with little regard to the adverse impact on the drainage systems in the areas. The filling of fishponds and low lying areas within the flood plains to form large paved storage yards has increased surface flows and blocked the drainage paths. To address this problem, land use management measures are now in place to ensure that the current flooding situation will not deteriorate due to further development and urbanisation on the New Territories' floodplain.

Development control is enforced through the Outline Zoning Plans (OZPs), the Town Planning Ordinance and the Drainage Impact Assessment requirements. All development requiring a change to the land use as specified in the OZPs or other Government development plans will need to seek approval from the Town Planning Board. If the project will significantly affect the drainage situation, private developers or the proponents of public projects, such as reclamation and highway projects, will need to conduct a Drainage Impact Assessment to demonstrate that, with their proposed mitigation measures, the flooding risk to the area concerned would not be increased. These management measures are a significant element in determining the need, scope and timing for the structural measures to be implemented, and in allowing development in the floodplain to proceed in a proper and controlled manner whilst the long term structural measures are being implemented.

Advice Note No 1 - Application of the Drainage Impact Assessment Process to private section projects (PDF format, 35KB)

Last revision date: 27 August 2008