Drainage Services Department The Government of the Hong Kong Special Administrative Region Brand HK
GovHK 简体版 繁體版
Submit search query Site Map
Default Font Size Larger Font Size Largest Font Size
Contact Us
Explanation of WCAG 2.0 Level Double-A Conformance
Color
Mobile Version
Mobile App
Print
Share
RSS
Tender Notices >

Forecast of Invitation to DSD Tenders

April 2018 to March 2019

Link to DEVB Homepage " Forecast of invitations to tenders"



 
PWP Item No.
Contract Title
Tentative Date of Gazettal / Inviting Tenders
Category *
Estimated Cost
Name and Tel. No. of Contact Person
4392DS & 4345DSContract No. DC/2018/03 Expansion of Sha Tau Kok Sewage Treatment Works, Phase 1 & North District Sewerage, Stage 2 Part 2A (ECC Opt C, BIM) April 2018RD
Group C
M4Ms. LO Chau Ling 2594 7256
4398DSContract No.
DC/2018/04
Sewerage at Lei
Yue Mun Village
(ECC Opt D, BIM)
April 2018RD
Group B
M3Mr. K. F.
SEIT
2594 7292
4222DS, 4236DS, 4343DS & 4100DXContract No.
DC/2018/01
Construction of
Village Sewerage
at Peng Chau and
Mui Wo, Modification
Works at Tai Po and
Siu Ho Wan Sewage
Treatment Works and
Minor Drainage and
Sewerage Works in
Urban Area and New
Territories
(ECC Option B, BIM)
May 2018R&D
Group B
M3Mr. Ben
T. M. YIP
2594 7502
4403DSContract No.
DC/2018/02
Upgrading of
Sewage Pumping
Stations and
Sewerage along
Ting Kok Road
(ECC Opt C, BIM)
May 2018RD
Group C
M4Mr. W. F.
WONG
2594 7255
4390DSContract No.
(DC/2018/09)
Rehabilitation of
Trunk Sewers in
Tuen Mun(ECC Opt D, BIM)
June 2018RD
Group C
M4Mr. H. S.
WONG
2594 7254
-Contract No. DE/2018/08
Term Contract for Overhaul,Maintenance, Testing and Plant Engineering Works of Electrical and Mechanical Installations at Various Sewage Treatment Facilities and Pumping Stations on Lantau and Outlying Islands (2019-2022) (NEC TSC Option A)
June 2018ELME,
INDU,
MANU
(Group II)
M3Mr. W. W.
HUI
2195 3460
-Contract No. DE/2018/05
Term Contract for
Inspection, Overhaul
and Testing of Electrical
and Mechanical Installations
at Stonecutters Island
Sewage Treatment Works
(NEC TSC Option A)
July 2018ELME(To be confirmed)Mr. Alan
S. K. TONG
2195 3339
-Contract No. DE/2018/12
Term Contract for
Maintenance and Overhaul
of Electrical and
Mechanical Installations
at Various Sewage
Treatment and Flood
Protection Facilities
in Hong Kong and
Kowloon (2019-2022)
(NEC TSC Option A)
September 2018ELME(To be confirmed)Mr. T. C.
TAI
2195 3338
4414DS & 4172CDContract No.
DC/2018/10
Condition Survey
and Rehabilitation
of Underground
Sewers and Stormwater
Drains – Stage 1
(ECC Opt: to be confirmed, BIM)
September 2018RD
Group C
M4Mr. Gary
K. W. FUNG
2594 7257
4108CDContract No. DC/2018/08 Inter-Reservoirs Transfer Scheme – Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir (ECC Opt: to be confirmed, BIM) September 2018To be confirmedM4Mr. K. F.
SEIT
2594 7292
4344DSContract No.
(To be confirmed)
Upgrading of Central
and East Kowloon
Sewerage – Phase 3
(ECC Opt : to be confirmed, BIM)
September 2018RD
Group C
M4Mr.C.C.
YEUNG
2594 7292
4399DSContract No.
DC/2018/05
Relocation of Sha
Tin Sewage Treatment
Works to Caverns –
Site Preparation
and Access Tunnel
Construction(NEC
ECC Opt : to be confirmed, BIM)
September 2018SF, RD
Group C
M4Mr.David
H.W.LEUNG
2594 7460
-Contract No.
DC/2019/01
Drainage Maintenance
and Construction in
Mainland North
Districts (2019-2023)
(TSC Opt: to be confirmed)
September 2018R&D
Group C
M4Mr.Y.K.LAI
2300 1154

Notes

1. The Forecast of Invitations to Tender is issued in good faith, but in no way indicates that tenders will be invited for the particular projects listed either at the time stated or at any time, and Government accepts no responsibility whatsoever for any loss or expenses that may be incurred as a result of the publication of the Forecast.

2. The following abbreviations are used in the Forecast -

* RD refers to "Roads and Drainage"; 
* ELME refers to "Electrical and Mechancial Installation for Sewage Treatment and Screening Plant"; 
* MANU refers to "Manufacture and Erection of Mechanical Plants and Equipment "; 
* GROU refers to "Ground Investigation Field Work";
* INDU refers to "Industrial Type Electrical Installation";

M1 : Up to $100 million (estimated cost) 
M2 : From $100 million, to $200 million (estimated cost) 
M3 : From $200 million, to $300 million (estimated cost) 
M4 : Exceeding $300 million (estimated cost) 

 
Back
Top