The Drainage Services Department The Government of the Hong Kong Special Administrative Region
GovHK
 
Search Site Map   Contact Us
  Print
DSD Technical Circulars and Practice Notes
Technical Manuals >DSD Technical Circulars and Practice Notes

List of DSD Technical Circulars and DSD Practice Notes

* List of DSD Technical Circulars and DSD Practice Notes still in Force

DSD Technical Circular

* 1/2012 - Lands Department Consent Scheme Forward Sales of Residential Flats

* 1/2011 - Handling of Utility Services Encroaching upon Public Drainage Facilities

* 3/2010 - Handling and Managing Serious and Emergency Incidents

* 2/2010 - Guidelines on the Provision and Control of Use of Contract Transport

* 5/2009 - Confined Space Safety Training for Competent Persons and Certified Workers Engaged in DSD's Works

* 2/2008 - Handling of Abandoned Pipes under DSD's Purview

* 4/2007 - Project Estimates, Pre-tender Estimates and Impossibility/Unforeseen Ground Conditions/Utility Interference

* 3/2007 - Use of New 675mm x 675mm Ductile Iron Manhole Cover and Frame

* 11/2006 - Financial Control of Consultancy Agreements

* 10/2006 - Resident Site Staff Establishment Committee

* 9/2006 - Vetting Committee on Aesthetic Design of Pumping Station Buildings

* 6/2006 - Delegation of Powers of the Drainage Authority under the Sewage Services Ordinance (Cap. 43), its Subsidiary Regulations and the Technical Memorandum 

* 5/2006 - Reporting of Serious Accident on Drainage Services Department Works Sites

* 4/2006 - Proactive Approach to Site Safety Management

* 3/2006 - Liaison with Labour Department and Marine Department on Site Safety Matters

* 2/2006 - Safety Training for DSD Staff

* 5/2005- Independent Inspection Agents

* 2/2005- Improvement Measures for Pipelaying Contracts in Urban Areas 

* 8/2004- The Management and Assessment of Risks of Time-critical Projects 

* 4/2004- Public Works Subcommittee Submissions 

* 3/2004- Block Allocation 4100DX - Drainage Works, Studies and Investigations for items in Category D of the Public Woks Programme 

* 2/2003- Authority to Approve Variations, Additional Payments and Additional Time in Works Contracts

* 3/2002 - Follow-up actions on Technical Andit Reports

* 2/2002 - Departmental Safety Mannal

* 14/2000 - Temporary Flow Diversions and Temporary Works Affecting Capacity in Stormwater Drainage Systems (27 September 2000)

* 5/2000 - Sewage Services Ordinance (Cap. 463) Instrument of Authorization

* 5/99 - Guidelines to prevent and to deal with problems associated with unreasonable high rates in Bills of Quantities

* 4/99 - Dry Weather Flow Interceptors

* 8/96 - Restrictions on Working Hours in Capital Works Contracts Arising from Traffic Needs

* 7/96 - Procedures in Dealing with Claims Arising from Enforcement of the Land Drainage Ordinance

* 4/96 - Implementation of the Land Drainage Ordinance

* 2/95 - Design Population for Estimation of Sewage Flow

* 4/94 - Discharge of Air-Conditioning Cooling Water to Public Drainage System

* 1/91 - Co-ordinated Replies

* 3/90 - Security Considerations for Users of Microcomputers

* 2/90 - Acquisition of Computer Facilities

 

DSD Practice Note

* DSD Practice Note No. 1/2012 Administration Procedure for Excavation in Unleased GovernmentLands under the Land (Miscellaneous Provisions) Ordinance (CAP28) (in PDF format, 1185k)

*  DSD Practice Note No. 1/2011 Design Checklists on Operation & Maintenance Requirements (in PDF format, 25906k)

*  DSD Practice Note No. 3/2010 Design Consideration for the Large Deep Gravity Sewers (in PDF format, 255k)

*  DSD Practice Note No. 1/2010 Guideeline for Hand-over of Completed Works to Operation and Maintenance Parties (in PDF format, 732k)

* DSD Practice Note No. 2/2008 Guidance Notes on Night Work by Contractors (in PDF format, 439k)

* DSD Practice Note No. 1/2008 Design Guidelines for Multi-part Covers (in PDF format, 747k)

* DSD Practice Note No. 1/2007 Safety Supervision of Work in Confined Space (in PDF format, 4417k)

* DSD Practice Note No. 1/2005 Guidelines on Enviornmental Considerations for River Channel Design (in PDF format, 6156k)

* DSD Practice Note No. 1/2004 Design Rainfall Depth for Temporary Works within the Dry Season (in PDF format, 298k)

* DSD Practice Note No. 3/2003 Design Considerations for Open Channels Accommodating Supercritical Flows (in PDF format, 244k)

* DSD Practice Note No. 2/2003 Dry Weather Flow Interception (in PDF format, 951k)

* DSD Practice Note No. 1/2003 (Version No. 2) Design of Stormwater Inlets (in PDF format, 1575k)

* DSD Practice Note No. 2/2002 Definition of Flooding and Classification of Flooding Blackspots (in PDF format, 126k)

* DSD Practice Note No. 1/2002 Safety of Operation of Excavators (in PDF format, 221k)

icon-acrobat.jpg *You may need to install Adobe Acrobat Reader to read some of the documents.

 
2009 © | Important notices | Privacy Policy