Drainage Services Department The Government of the Hong Kong Special Administrative Region Brand HK
GovHK 简体版 繁體版
Submit search query Site Map
Default Font Size Larger Font Size Largest Font Size
Contact Us
Explanation of WCAG 2.0 Level Double-A Conformance
Color
Mobile Version
Mobile App
Print
Share
RSS
Technical Documents >

DSD Technical Circulars and Practice Notes

List of DSD Technical Circulars and DSD Practice Notes
List of DSD Technical Circulars and DSD Practice Notes still in Force
DSD Technical Circular
2/2017 - Project Estimates, Pre-tender Estimates and Impossibility/Unforeseen Ground Conditions/Utility Interference
1/2017 - Temporary Flow Diversions and Temporary Works Affecting Capacity in Stormwater Drainage Systems
1/2016 - Dry Weather Flow Interceptors
5/2015 - Approval and Related Authorities for Variations and Claims under Works Contracts
4/2015 - Tree Works Vetting Panel of DSD
3/2015 - Vetting Committee on Aesthetic Design of Drainage Services Buildings
2/2015 - Reporting New Sewer Connections and the Related Procedures
1/2015 - Knowledge Management Portal
2/2014 - Handling and Managing Serious and Emergency Incidents
1/2014 - Co-ordinated Replies
3/2012 - Confined Space Safety Training for Competent Persons and Certified Workers Engaged in DSD's Works
2/2012 - Proactive Approach to Site Safety Management
1/2012 - Lands Department Consent Scheme Forward Sales of Residential Flats
1/2011 - Handling of Utility Services Encroaching upon Public Drainage Facilities
2/2010 - Guidelines on the Provision and Control of Use of Contract Transport
2/2008 - Handling of Abandoned Pipes under DSD's Purview
11/2006 - Financial Control of Consultancy Agreements
10/2006 - Resident Site Staff Establishment Committee
6/2006 - Delegation of Powers of the Drainage Authority under the Sewage Services Ordinance (Cap. 43), its Subsidiary Regulations and the Technical Memorandum 
5/2006 - Reporting of Serious Accident on Drainage Services Department Works Sites
3/2006 - Liaison with Labour Department and Marine Department on Site Safety Matters
2/2006 - Safety Training for DSD Staff
5/2005 - Independent Inspection Agents
2/2005 - Improvement Measures for Pipelaying Contracts in Urban Areas 
8/2004 - The Management and Assessment of Risks of Time-critical Projects 
4/2004 - Public Works Subcommittee Submissions
3/2004 - Block Allocation 4100DX - Drainage Works, Studies and Investigations for items in Category D of the Public Woks Programme
3/2002 - Follow-up actions on Technical Andit Reports
2/2002 - Departmental Safety Mannal
5/2000 - Sewage Services Ordinance (Cap. 463) Instrument of Authorization
5/99 - Guidelines to prevent and to deal with problems associated with unreasonable high rates in Bills of Quantities
8/96 - Restrictions on Working Hours in Capital Works Contracts Arising from Traffic Needs
4/94 - Discharge of Air-Conditioning Cooling Water to Public Drainage System
3/90 - Security Considerations for Users of Microcomputers
2/90 - Acquisition of Computer Facilities
DSD Practice Note
DSD Practice Note No. 1/2017 Design Rainfall Depth and Profile for Temporary Works within the Dry Season
DSD Practice Note No. 1/2016 Guideline on Dry Weather Flow Interceptors
DSD Practice Note No. 1/2015 Guidelines on Environmental and Ecological Considerations for River Channel Design
DSD Practice Note No. 3/2012 Safety Supervision of Work in Confined Space
DSD Practice Note No. 1/2012 Administration Procedure for Excavation in Unleased GovernmentLands under the Land (Miscellaneous Provisions) Ordinance (CAP28)
DSD Practice Note No. 1/2011 Design Checklists on Operation & Maintenance Requirements
DSD Practice Note No. 3/2010 Design Consideration for the Large Deep Gravity Sewers
DSD Practice Note No. 1/2010 Guideeline for Hand-over of Completed Works to Operation and Maintenance Parties
DSD Practice Note No. 2/2008 Guidance Notes on Night Work by Contractors
DSD Practice Note No. 1/2008 Design Guidelines for Multi-part Covers
DSD Practice Note No. 3/2003 (Version No. 2) Design Considerations for Open Channels Accommodating Supercritical Flows
DSD Parctice Note No. 1/2003 (Version 3) Design of Stormwater Inlets
DSD Practice Note No. 2/2002 Definition of Flooding and Classification of Flooding Blackspots
DSD Practice Note No. 1/2002 Safety of Operation of Excavators
icon-acrobat.jpg *You may need to install Adobe Acrobat Reader to read some of the documents.
Back
Top