Events Miscellaneous Reports Events DSD Projects won Silver and Merit Awards in Skyrise Greenery Awards 2012 (Date: 8/5/2012) Hong Kong Awards for Environmental Excellence to DSD (Headquarters) (Date: 4/5/2012) Director of Drainage Services presented a keynote speech in CHKSTT Conference on Trenchless Technologies (Date: 27/4/2012) DSD awarded the Winner of 2012 IWA Project Innovation Awards - East Asia Regional Awards in Planning Category (Date: 20/4/2012) Tenders invited for Happy Valley Underground Stormwater Storage Scheme (Date: 5/4/2012) DSD Annual Media Briefing 2012 (Date: 30/3/2012) DSD awarded the Gold Award for Unique Feature in Hong Kong Flower Show 2012 (Date: 17/3/2012) The Construction Sites Housekeeping Award Scheme 2011 – Award Presentation Ceremony (Date: 12/3/2012) DSD projects won 11 Awards in Construction Industry Safety Award Scheme 2011/2012 (Date: 12/3/2012) DSD awarded the First-Runner-up of the Safety Leadership Awards 2012 organized by the Lighthouse Club and CIC (Date: 9/3/2012) 2012 DSD Open Day concluded successfully (Date: 4/3/2012) Press Release: Drainage Services Department Open Day (Date: 23/2/2012) Standard Chartered Marathon 2012 – Participated by “DSD Partners” (Date: 5/2/2012) Contract Awarded for Contract No. CE22/2011(DS) “Review of Drainage Master Plan in East Kowloon – Feasibility Study” (Date: 31/01/2012) Contract Awarded for Contract No. CE21/2011(DS) “Review of Drainage Master Plan in West Kowloon – Feasibility Study” (Date: 17/01/2012) 2012 Drainage Services Department Open Day (Date: 3-4/3/2012) Contract awarded for Contract No. DC/2010/10 “Sewerage in Ping Kong, Fu Tei Pai and Tai Wo” (Date: 1/12/2011) Main tunnel breakthrough at Lai Chi Kok Drainage Tunnel (Date: 13/12/2011) DSD awarded the Winner of the International Tunnelling Awards 2011 organized by New Civil Engineer and Ground Engineering (Date: 1/12/2011) Briefing Session to Engineering Consultants for "Agreement No. CE 43/2011 (DS) - Relocation of Sha Tin Sewage Treatment Works to Caverns – Feasibility Study" on 2 December 2011 (Date: 5/12/2011) DSD Research & Development Forum 2011 (Date: 24/11/2011) DSD awarded the Ombudsman's Award 2011 (Date: 17/11/2011) Community Tree Planting at Fuk Man Road, Sai Kung (Date: 16/11/2011) DSD Green Groups Forum (Date: 10/11/2011) First major works contract awarded for improvement of Kai Tak River (Date: 09/11/2011) DSD awarded the 1st prize of Civil Engineering Paper of the Year Award 2011 organized by the Civil Division of the Hong Kong Institution of Engineers (Date: 4/11/2011) WSD and DSD send condolences to family of Ng Kee-wah (Date: 26.10.2011) DSD's response to the odor concern at Chung Hing Praya Street, Cheung Chau (Date: 18.10.2011) (Chinese version only) Contract awarded for Contract No. DC/2011/02 “Construction of Lau Fau Shan Trunk Sewerage and Drainage” (Date:13/10/2011) Contract awarded for Tuen Mun Village Sewerage and Trunk Sewers at Pillar Point (Date: 20/09/2011) DSD's response to the FTU's concern for the flooding black spots and the relevant flood prevention works in Hong Kong (Date: 14/09/2011) (Chinese version only) Contract awarded for Harbour Area Treatment Scheme Stage 2A (Date: 14/09/2011) Tsuen Wan District Council visited the site of Tsuen Wan Drainage Tunnel (Date: 31/08/2011) Consultancy agreement awarded for Detailed Design of Regulation of Shenzhen River Stage 4 (Date: 18/08/2011) Deputy Director of Drainage Services gave an interview to the media on tree transplantation (Date: 11/08/2011) Contract awarded for Harbour Area Treatment Scheme Stage 2A (Date: 11/08/2011) Team Building and Work-Life Balance (Date: 10/8/2011) Contract Signing Ceremony on “DE/2010/07 – Supply and Installation of an Additional Combined Heat Power Generation System at Tai Po Sewage Treatment Works” (Date: 28/07/2011) Completion Ceremony for Contract No. DC/2007/02 Drainage Improvement Works in Lung Yeuk Tau, Kwan Tei South and Leng Tsai, Fanling (Date: 21/07/2011) DSD organised dragon boat trainings and participated in various races (Date: May - July 2011) Public Engagement Programme “Building our Kai Tak River” (Date: 25/06/2011) Tenders invited for reconstruction, improvement and rehabilitation of Kai Tak River (Date: 10/6/2011) Drainage Services Department responds to Coroner's findings on flooding incident at Sha Po Tsai Village (20/04/2011) Greening for river improvement project in Ma Wat River, Tai Po (Date: 09/04/2011) Replies to initial written questions and supplementary questions raised by Finance Committee Members in examining the Estimates of Expenditure 2011-12 (Date: 1/4/2011) DSD win Safety Leadership Awards 2011 on 29 March 2011 Contract awarded for Harbour Area Treatment Scheme Stage 2A (Date: 09/03/2011) Contract awarded for Harbour Area Treatment Scheme (HATS) Stage 2A (20/01/2011) Special Traffic Arrangements in Sai Kung to facilitate improvement of Fuk Man Road nullah (Date: 05/01/2011) Open Day at Shatin Sewage Treatment Works on 27-28 November 2010 Opening ceremony of Trenchless Construction Exhibition under the contract - Tuen Mun Western Trunk Sewerage on 5 November 2010 Innovation Carnival 2010 held at Science Park from 6 -14 November 2010 Contract awarded for Harbour Area Treatment Scheme Stage 2A (Date: 25/8/2010) Investigations into flooding at Sha Po Tsai Village completed Media briefing on DSD’s greening efforts at Shatin Sewage Treatment Works on 8 June 2010 Contract awarded for Construction of Sewage Treatment Works at Yung Shue Wan and Sok Kwu Wan (Contract No. DC/2009/13) (14/05/2010) Press briefing on the Lai Chi Kok Drainage Tunnel project and the breakthrough of the Branch Tunnel on 18 January 2011 Press briefing on the Water Reclamation Facilities and Information Centre at the Shatin Sewage Treatment Works on 7 February 2011 Hong Kong West Drainage Tunnel Breakthrough Ceremony cum Media Briefing on Flood Prevention Measures for Hong Kong Island on 17 February 2011 DSD won a 3rd level prize in the 4th Exposition on Green Construction and Energy Conservation in FuZhou in June 2010 Tunnel Boring Machine (TBM) Launching Ceremony of the Lai Chi Kok Drainage Tunnel on 8 January 2010 Sheung Wan Floodwater Pumping Station Media Briefing on 2 February 2010 DSD awards contract for improvement works in Sai Kung (04/09/2009) Miscellaneous Reports Investigation Report on the Flooding in Sha Po Tsai Village, Tai Po on 22 July 2010 - Executive Summary (Date: 19/08/2011) Review of Investigation Report on the Flooding in Sha Po Tsai Village, Tai Po on 22 July 2010 (Relevant Document uploaded in website of Development Bureau) (Date: 19/08/2011) Report on Industrial Accident at Stonecutters Island Sewage Treatment Works on 7 May 2010