Drainage Services Department The Government of the Hong Kong Special Administrative Region Brand HK
GovHK 简体版 繁體版
Submit search query Site Map
Default Font Size Larger Font Size Largest Font Size
Contact Us
Explanation of WCAG 2.0 Level Double-A Conformance
Color
Mobile Version
Mobile App
Print
Share
RSS
Publicity and Publications >Publicity >Events & Others >
Contract Awarded for Contract No. CE22/2011(DS) “Review of Drainage Master Plan in East Kowloon – Feasibility Study” (Date: 31/01/2012)

The Drainage Services Department has signed a $6.2 million consultancy contract with Mott MacDonald Hong Kong Limited on 31 January 2012 to conduct a study to review the Drainage Master Plan of the Stormwater Drainage Master Plan Study in East Kowloon which was conducted over ten years ago.

The hydrological and hydraulic models used will be upgraded to facilitate the assessment of the drainage systems for formulation of improvement proposals to cope with the latest planned development scenarios.  The study is expected to be completed in 30 months.  The estimated cost of the study, including the anticipated surveys and site investigations, is $13.4 million.

       Drainage Systems in Study Area

Drainage Systems in Study Area
 
Mr. Chan Pak-keung (AD/O&M) (second left) attended the Contract Signing Ceremony

Mr. Chan Pak-keung (AD/O&M) (second left) attended the Contract Signing Ceremony

 

For more information about this contract, please refer to the following hyperlink:

/EN/Our_Projects/Contracts_Consultancies_Awarded/ContractsProject2012-1.html

Back
Top