Drainage Services Department The Government of the Hong Kong Special Administrative Region Brand HK
GovHK 简体版 繁體版
Submit search query Site Map
Default Font Size Larger Font Size Largest Font Size
Contact Us
Explanation of WCAG 2.0 Level Double-A Conformance
Color
Mobile Version
Mobile App
Print
Share
RSS
Publicity and Publications >Publicity >Events & Others >
DSD awarded Agreement No. CE 49/2016 (DS) “Review of Drainage Master Plan in Tuen Mun, Tsuen Wan and Kwai Tsing – Feasibility Study” (Date: 1 August 2017)
The Drainage Services Department signed a $8 million consultancy agreement on 1 August 2017 with Black & Veatch Hong Kong Limited for undertaking the feasibility study for the review of drainage master plan in Tuen Mun, Tsuen Wan and Kwai Tsing.

The scope of the consultancy agreement comprises examining the performance of the existing stormwater drainage and proposing short-term and long-term drainage improvement measures to further reduce the risk of flooding in the study area and cope with future developments.  The consultancy agreement will last for about 36 months.


The Assistant Director / Operations and Maintenance of DSD, Mr Fedrick KAN Yim-fai (second right) and the Director of Black & Veatch Hong Kong Limited, Mr Andy KWOK, (second left), attended the Agreement Signing Ceremony

The Assistant Director / Operations and Maintenance of DSD, Mr Fedrick KAN Yim-fai (second right) and the Director of Black & Veatch Hong Kong Limited, Mr Andy KWOK, (second left), attended the Agreement Signing Ceremony

 
 
Back
Top